Installation & Operation Manual:
Automated Forklift Entryway Sanitizing System
_________________________________________________________________________________________________
12 |
P a g e
9.
With the jug rack, pumping module, and nozzles located, you may now install the
chemical tubing. Start by placing a one gallon container of sanitizer in the jug rack. Unclip
the safety cable from the cable clip and route the cable through the handle of the jug and
then reattach to the clip. (Figure 13)
Figure 13
Remove the cap from the sanitizer jug and attach the one-gallon adapter cap assembly by
pushing down firmly as you turn the adapter clockwise
. Insert the ¼” PE tubing into the
push-fit fitting on the adapter cap and press firmly until the tubing is fully seated into the
fitting. * Note. It is important that the tubing end be cut square and to press it in straight.
Do not force the tubing or press at an angle. The tubing should insert approximately 1/2”.
(Figure 13)
Route the tubing from the one-gallon container to the pumping module and mark the cut
location using a piece of tape
.
(the tape from the tubing wrap works well for this)
DO NOT
CUT THE TUBING AT THIS POINT.
Lift the engine inspection cover and or seat, depending
on your lift design, and ensure that the tubing does not get in the way or become
pinched. If this requires temporarily moving the jug rack to an alternate location for
inspection, you may move it. Be sure to leave enough extra tubing to allow both locations.
(Figure 14)