Klauke TEXTRON PK 25/2 Скачать руководство пользователя страница 7

 

 

 
 

Instruction Manual 

for the hydraulic crimping tool Type PK 25/2, Serial-No. ............................ 
 

Index 

 

1.  

Introduction 

2.  

Labels 

3.  

Warranty 

4.  

Description of the hydraulic crimping unit 

4.1.   Description of the components 
4.2.   Description of the crimping processes 
5.  

Remarks with respect to the determined use 

5.1.   Operation of the unit 
5.2.   Explanation of the application range 
5.3.   Mounting instructions 
5.4.   Service and Maintenance instructions  
5.5.   Reference as to which (spare-) parts can be exchanged by the customer 
6.  

Troubleshooting 

7.  

Technical data 

 
 

1. Introduction

 

 
    Before starting to use the tool please read the instruction manual carefully. 
 
 
 
    Use this tool exclusively for its determined use. 
 
    Mounting and assembly of connecting material with the help of this tool must only be  
    performed by specially trained personnel. The minimum age is 16 years. 
 
    This instruction manual must be carried along during the entire life span of that tool. 
 
    The operator must 
    - guaranty the availability of the instruction manual for the user and 
    - make sure, that the user has read and understood the instruction manual. 
 

2. Labels

 

 
    On the labels fixed on the unit you’ll find the type specification, name of the manufacturer  
    and/or the company logo. The serial number is on the hydraulic cylinder. 
 

3. Warranty

 

 
    If correct operation is guaranteed and regular service is provided our warranty is 1 year      
    from the time of delivery. 

Содержание PK 25/2

Страница 1: ...l Inhaltsangabe 1 Einleitung 2 Aufschriften 3 Gew hrleistung 4 Beschreibung des hydraulischen Pre kopfes 4 1 Beschreibung der Komponenten 4 2 Beschreibung des Pre vorganges 5 Hinweise zum bestimmungsg...

Страница 2: ...esamten Lebensdauer des Werkzeuges mitzuf hren Der Betreiber mu dem Bediener die Betriebsanleitung zug nglich machen und sich vergewissern da der Bediener sie gelesen und verstanden hat 2 Aufschriften...

Страница 3: ...zur Verpressung von Verbindungsmaterialien entnehmen Sie bitte unserem Montagehinweisen im Katalog 5 Hinweise zum bestimmungsgem en Gebrauch In Verbindung mit einem 2 m Hochdruckschlauch ist das Arbei...

Страница 4: ...ktorleiter ______________________________________________________________________________________________________________ g 16 240 mm Quetschkabelschuhe DIN 46234 Stiftkabelschuhe DIN 46230 __________...

Страница 5: ...gelb chromatiert k isol Rohr KS VB IS QS gelb chromatiert l Doppelpre KS QS QS gelb chromatiert m AEH DIN 46228 AE QS gelb chromatiert Abk zungen KS Kabelschuhe VB Verbinder AEH Aderendh lsen QS Quer...

Страница 6: ...ei St rungen Erreicht der Pre kopf nicht seine volle Pre kraft so kann Luft in das Hydrauliksystem eingedrungen sein Abhilfe Halten Sie bitte den Pre kopf tiefer als die Pumpe und bet tigen Sie den Pu...

Страница 7: ...the instruction manual carefully Use this tool exclusively for its determined use Mounting and assembly of connecting material with the help of this tool must only be performed by specially trained pe...

Страница 8: ...mp is reached More information about the assembly of the connecting material can be taken from the assembly instructions in our catalogue 5 Remarks with respect to the determined use The pump must be...

Страница 9: ..._ f 10 240 sm mm Pre rounding dies for Al and Cu Sectorconductors 35 300 se mm ___________________________________________________________________________________________________________ g 10 50 mm So...

Страница 10: ...plated yellow h Insulated terminals ISQ QS QS chrome plated yellow i Tub CL for fine str conductors F QS QS chrome plated yellow j C clamps C QS chrome plated yellow k Pre insulated tub CL and connec...

Страница 11: ...ed to be changed by the customer Do not attempt to repair the tool yourself and do not remove any parts such as screws and other components 6 Troubleshooting The tool loses oil Return the tool to the...

Страница 12: ...ni Electricidade Lda Mrs Anna Pereira Rua Serpa Pinto 15 A P 1200 Lisboa Portugal Tel 351 21 3223400 Fax 351 21 3223410 SLOWENIEN Isaria d o o Proizvdnja in trgovina Cece 2a 1420 Trovlje Slowenien Tel...

Страница 13: ...ND Uni Mark Pro Mr Alexander Naichouller 119147 Moscow Aarksistskaya 4 Russland Tel 007 095 7480907 Fax 007 095 7480909 E Mail mark unit ru Geplante planned Service Center in 2003 LIBANON Georges Khou...

Страница 14: ...Konformit t des kompletten elektro hydraulischen Aggregates mit den Richtlinien 98 37 EG und 72 23 EWG festgestellt ist Wir best tigen die Konformit t des oben genannten Produktes mit der Richtlinie 9...

Отзывы: