830.013.02.K_Installation Guidelines (USA ONLY!) - cBoxX (Version 1.3).docx
5 | P a g e
1.6
Crane Transport:
If a crane will be used to transport the chiller, please note the following:
Lift the chiller only from its base. Insert two steel rods through the holes in the base. Rods
must be specifically designed for this purpose, and able to support the weight of the unit (see
chart).
Secure the rods with locking pins to prevent shifting. Use only lifting straps or rope for lifting
from the rod
The straps or ropes must be held in place with a frame to keep them from pressing into the
side walls, gutters, and condenser body. (Refer to the following graphic).
Metal rope or chains, must
not
be used!
cBoxX60
cBoxX70
118
in.
, 3,94 in.
, 0,2 in.
, 1,2-2 in.
Содержание cBoxX 60
Страница 17: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 16 P a g e SEP cabinet ...
Страница 20: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 19 P a g e 7 1 2 Startup Checklist ...
Страница 21: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 20 P a g e ...