830.013.02.K_Installation Guidelines (USA ONLY!) - cBoxX (Version 1.3).docx
13 | P a g e
Fluid Connections CIP:
Connection to chiller (In/Out): 1-1/2” NPT (F)
Connection to the LCC (In/Out): 1-1/2” BSP (F)
Connection to emergency cooling: ¾” NPT (F)
Connection for Drain: ½” hose connector
Location of mounting holes
Holes for M8
122 mm
366 mm
4,8 in.
14,41 in.
12
5m
m
4,9
2
in.
79
5
m
31
,3
in.
360 mm
14,17 in.
Содержание cBoxX 60
Страница 17: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 16 P a g e SEP cabinet ...
Страница 20: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 19 P a g e 7 1 2 Startup Checklist ...
Страница 21: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 20 P a g e ...