For distances exceeding 

328 ft.

 (

100M)

 of straight pipe one way, e-mail the actual pipe 

length, the difference in height, and the required pipe elbows to  

[email protected]
 

 

Maximum allowed elbows in total piping run is ~ 20 pcs.  
  

 

Long radius elbows 

must

 be used. 

 

 
 

2.6

 

External installations guidelines (cBoxX 60 + 70) – IMPORTANT!  

 

 

Содержание cBoxX 60

Страница 1: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx KKT chillers Inc cBoxX SERIES INSTALLATION GUIDELINES cBoxX 60 cBoxX 70 ...

Страница 2: ...e 8 in 200mm wider and 8 in 200mm longer than the chiller cabinet Leveling feet Fig 1 2 are used for vibration isolation and height adjustment Rooftop curbing to be installed per your local building code specifications 1 2 Minimum Pad Dimensions cBoxX 60 Approx 57in 1448mm long by 41 in 1041mm wide cBoxX 70 Approx 81in 2057mm long by 41 in 1041mm wide cBoxX 60 cBoxX 70 1 3 Chiller weights Model cB...

Страница 3: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 2 P a g e Transport Crated Weight 1720 lbs 780kg 1863 lbs 845kg ...

Страница 4: ...3 P a g e 1 4 Installation Clearance Maintain at least 40 in 1000mm around all four sides of the chiller for air circulation and servicing Maintain at least 8 feet clearance 2500mm above the chiller to allow proper discharge of warm air from the chiller cBoxX 60 cBoxX 70 ...

Страница 5: ... Length Approx 56 in 1430 mm Width Approx 41 in 1030 mm Height Approx 88 in 2230 mm cBoxX 70 Length Approx 80 in 2030 mm Width Approx 41 in 1030 mm Height Approx 88 in 2230 mm You will also need to consider the height of the transport equipment pallets lift truck transport rollers etc cBoxX60 cBoxX70 37 in 37 in 37 in 37 in 1 in 2 in 1 in 2 6 in ...

Страница 6: ...e Rods must be specifically designed for this purpose and able to support the weight of the unit see chart Secure the rods with locking pins to prevent shifting Use only lifting straps or rope for lifting from the rod The straps or ropes must be held in place with a frame to keep them from pressing into the side walls gutters and condenser body Refer to the following graphic Metal rope or chains m...

Страница 7: ...dius 90 Degree Elbows Glycol 35 to 50 cBoxX 60 US Version 2000 1 1 2 RP 50M 164 1 1 2 Pipe 10 long radius elbows one way or 20 round trip 35 to 50 cBoxX 70 US Version 2000 2 RP 0 100M 328 1 1 2 Pipe 10 long radius elbows one way or 20 round trip 35 to 50 KKT Chiller Max Allowed Elevation above Sea Level Connections at Chiller metric Max Allowed One Way Piping Max Long Radius 90 Degree Elbows Glyco...

Страница 8: ...ing 328 ft 100M of straight pipe one way e mail the actual pipe length the difference in height and the required pipe elbows to support kkt chillersusa com Maximum allowed elbows in total piping run is 20 pcs Long radius elbows must be used 2 6 External installations guidelines cBoxX 60 70 IMPORTANT ...

Страница 9: ...otive anti freeze or mixture containing 50 concentration of glycol DO not mix different brands or types of glycol without approval from the factory Tap water should not be used Required Volume Piping Calculations Pipe size 2 1 2 2 43 Gal Ft 2 8 ltr mtr Pipe size 2 1 74 Gal Ft 2 0 ltr mtr Pipe size 1 1 2 1 04 Gal Ft 1 2 ltr mtr Volume needed for the chiller is 13 gal 50 l Take into consideration th...

Страница 10: ...rence As such the use of grounding straps instead of cables is advised Moreover cable shields must be connected with purpose made ground clips The grounding surface must be highly conductive bare metal Remove any coats of varnish and paint The grounding wire must be sized in accordance with local regulations and at minimum the same gauge wire as connected to the main power supply The grounding mus...

Страница 11: ...e cable 50 m long for connecting the chiller to the remote display panel The remote display panel controls the complete function of the controller in the main chiller 5 0 Options and Accessories 5 1 Chiller Interface Panel CIP Weight Net Empty weight CIP Approx 121 25 lbs 55 kg Gross Weight Operation Wet Approx 132 27 lbs 60 kg Transport weight Approx 242 50 lbs 110 kg Dimensions Depth Approx 14 i...

Страница 12: ...o the wall using mounting screws and plastic spaces provided Review Installation and Operation instructions provided with the CIP panel for further information panel and walls floor as indicated below Note The figure represented is an example only and may not represent actual installation conditions 300m 300m 12 12 m500 20 ...

Страница 13: ...x 12 P a g e Attention Observe the minimum clearance in front of the panel for service access as indicated in the drawing below Attention Observe the minimum clearances between the Note Use provided spacers 3 qty for wall mounting 300m 300m 12 in 12 in 10 00 m m 40 in ...

Страница 14: ...onnections CIP Connection to chiller In Out 1 1 2 NPT F Connection to the LCC In Out 1 1 2 BSP F Connection to emergency cooling NPT F Connection for Drain hose connector Location of mounting holes Holes for M8 122 mm 366 mm 4 8 in 14 41 in 12 5m m 4 9 2 in 79 5 m 31 3 in 360 mm 14 17 in ...

Страница 15: ...n 300 mm Height Approx 5 in 120 mm 1 Remote display should be mounted near the desk in the MRI control room Use of proper screw type designed for your specific mounting surface wood concrete etc is required Recommended screw size M8 2 The provided 4 wire transfer cable 164 50 m must be pulled from the chiller and connected to the remote display in the MRI Control room see diagrams below 35 mm 35 m...

Страница 16: ...K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 15 P a g e Example Circuit Overview Data transfer cable needs to be placed in 1 conduit Please use conduit for transfer cable ONLY and NOT for power supply ...

Страница 17: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 16 P a g e SEP cabinet ...

Страница 18: ...nical Contractor responsible for the Electrical and Piping installation must be on site during the Startup visit The site s plumbing lines must be flushed before connecting the chiller Additionally all lines must be leak checked with pressurized air no water prior to the arrival of KKT s technician All wiring must be installed and connections made prior to our arrival Additionally safety disconnec...

Страница 19: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 18 P a g e 7 0 Addendum 7 1 USA 7 1 1 Pre Startup Checklist ...

Страница 20: ...830 013 02 K_Installation Guidelines USA ONLY cBoxX Version 1 3 docx 19 P a g e 7 1 2 Startup Checklist ...