background image

18

How to install

Caution for piping

WARNING

WARNING

Install the Nitrogen vessel at a location 1 m above 

the top of the boiler.

(Install the vessel at a location 1 m above the pipe on 

the floor when you install the vessel in a cellar.)

The supply line of hot water shall be connected to 

the water tank on the rooftop, not directly to the tap 

water line.

Do not use the check valve on the pipe of makeup 

water and discharge.

The water pressure in the DHW(domestic hot water)

supply pipe shall be kept at 0.6 – 1 kg/cm . Install the

reduction valve when using the supply water pump,

or making  direct connection to the tap water line.

Use the tees on the heating outlet of the heating pipe

and the discharge pipe to install the expansion pipe

on the separated pipe.

(Install the natural circulation preventing pipe when 

installing at a cellar.)

Use the circulation pump with appropriate capacity, 

and install the discharge valve.

Use the expansion 

pipe larger than 20A.

 When connecting 

the expansion 

pipe, no pipe 

shall be bent.

Nitrogen vessel

Nitrogen vessel

Nitrogen vessel

Circulation pump

1M or higher

Outlet of hot 

water

Direct connection to 

tap water line

Circulation pump

Check valve

Hot

water 

tank

(If the water pressure is excessively high, 

use the reduction valve.)

Circulation 

preventing 

pipe

Expansion pipe

20A or higher

Central Heating

Return

Discharge valve

Circulation tank

19

KRP-20A

10,000~20,000

10,000~20,000

1,256 x 828 x 1,400

25 A

15 A

Ø150

300 

5.43 

/h

66 ~ 99 

AC 230V / 50Hz

· 

kcal/h

kcal/h

Specification for wood pellet boiler

 The specifications are subject to 

    change for improving performance of 

    the product.

 The specifications may vary dependent 

    upon installation environment, ambient 

    conditions and climate.

 Never install the boiler for heating area 

    greater than 99

.

Model

Item

Max. CH

output

Hot water 

output

Heat exchanger 

structure

Air control mode

Operating power

Safety functions

Overheat shutdown function, low level function, flame 

extinguishing function, counter-flow flame prevention function, 

latent heat elevation prevention, duel frozen rupture prevention

Dimensions

(W x L x H)

Fuel size

(W x L x T)

Mode 

Heating Inlet/Outlet

Ignition 

Inlet and outlet of

heating(hot water)

Hopper capacity

Heating pressure

Hourly consumption

Hopper capacity

Ash generation

Heating area

STANDING TYPE 1 PASS

Forced fan (blower type)

Pellet (for Ø6)

Hot Water & Heating

Electric coil heater

3.5 bar or lower

Less than 1% (complete combustion)

The pipe shall be installed in such a way that 

the boiler operates  at pressure lower than 1 

kg/m2 when installing the pipes in closed

type(1 bar)

(The boiler may be damaged due to abnormal 

pressure resulted from solid fuel.) 

Warning! The safety valve shall be 

checked every six months without failure

2

Содержание KRP-20A

Страница 1: ...the boiler after reading it The user s manual describes the features of the product and the safety requirements Please read and make sure you fully understand the user s manual before using the products to ensure an extended lifecycle Pellet KITURAMI Wood Pellet Boiler Wood PELLET BOILER ...

Страница 2: ...njury to the user or damage to the product Structure and name Cleaning port Controller Internal circulation pump Hot water coil Screw set Burner Ash tray drawer Hopper lid Fuel tank hopper 200 kg Features Accessories Cleaning tools user s manual cleaning brush water draining tee and room thermostat Heat exchanger High efficiency in Korea Certified for heating efficiency of 82 under the certificati...

Страница 3: ...al mode Keeping pressing the button for 5 sec converted into manual mode FND OFF in manual mode Allowed to turn on off fuel feed manually in manual mode Fuel supply kept ON for 3 min only in manual mode Allowed to turn on off exhaust fan manually in manual mode Release upon turning the power button on off Used for verifying and setting initialization start shutdown fuel time Lighting upon fuel fee...

Страница 4: ...utton This button is for turning power on off it is used when restarting the boiler after correcting a failure of the boiler Restart allowed up to 3 times in sequence restart allowed after 5 minute s standby How to use the function of room thermostat Use the button to display on the screen Set the desired temperature with the Up Down button The boiler starts operating when the desired temperature ...

Страница 5: ...on the season and the insulation conditions of the houses Press the button to display Outing The Outing function is capable of maintaining the room temperature at the minimal level and of preventing a rupture of the boiler Function of preventing frozen rupture The function for preventing a rupture of the boiler during freezing weather conditions maintains the proper temperature of the boiler body ...

Страница 6: ...NING Use the power outlet exclusive for the boiler and be cautious for leakage Never disassemble repair or modify without approval of the manufacturer Never touch the flue while you operate boiler Do not place combustible or inflammable materials in the vicinity of the boiler Cautions when using the bathing function The operating power is AC 230 50Hz Operate the boiler only after checking the volt...

Страница 7: ... year You can operate the boiler safely only when the boiler has been properly inspected Request your distributor to conduct periodic inspections of the fire tube and to clean the burner once or twice every six months WARNING CAUTION 13 8 6 m m 32 640 0 7 600 1 5 5 1 0 1 9 6 1 0 4 0 4 0 8 1 0 0 3 4 550 3 0 500 6 0 6 25 mm kg kcal kg MJ kg Precautions for operation Precautions for operation Keep th...

Страница 8: ...ge quantity of lime or salinity causes corrosion of the product Always use tap water if possible Use the outlet exclusive for the boiler Prevent the flue from contact with combustible materials Install the boiler in a boiler room if any Drainage of boiler Keep the floor level by making use of incombustible materials such as cement blocks prior to installing the boiler Make sure throughly for keepi...

Страница 9: ... piping diagram Closed heating circuit The use safety valve be sure to set its pressure at 2 5 kgf and internal pressure below 1 kgf If the safety valve operates frequently due to an increase of the pressure inside the pipe check the nitrogen level inside the nitrogen vessel and fill the vessel with nitrogen if required Install the safety valve the nitrogen valve the pressure gauge and the air ven...

Страница 10: ...irculation preventing pipe Expansion pipe 20A or higher Central Heating Return Discharge valve Circulation tank 19 KRP 20A 10 000 20 000 10 000 20 000 1 256x828x1 400 25 A 15 A Ø150 300 5 43 h 66 99 AC 230V 50Hz kcal h kcal h Specification for wood pellet boiler The specifications are subject to change for improving performance of the product The specifications may vary dependent upon installation...

Страница 11: ...n the fuel storage tank is insufficient Fill the tank with fuel to the fuel feed line Foreign materials are caught on the fuel feed screw so the screw does not operate Remove any foreign materials gloves barks and parts of the gunny bag Check the photo sensor for any defects at a voltage lower than 2 5 VDC Remove fuel that has been exposed to moisture and has congealed See photo 1 See photo 2 See ...

Страница 12: ...iggering of the overheat sensor bimetal due to counter flow of flame No Failure Troubleshooting Remarks No Failure Troubleshooting Remarks 1 Symptom Detecting water temperature higher than 93 by the water temperature sensor detecting temperature higher than 92 by the overheat sensor 2 Recovery Automatic recovery upon water temperature lower than 88 overheat lower than 87 1 Step 1 Temperature at th...

Страница 13: ... is lit and if the fuel feed motor operates normally After operating the boiler for one to two minutes make sure that the pellets are fed through the feeding hose After making sure that the pellets are being fed into the burner press the Power button to stop manual fuel feeding Press the Power button again to operate the boiler 25 Commissioning NO 1 NO 2 NO 3 NO 4 No 5 6 HOT 4000N ...

Страница 14: ...26 Memo 27 Memo ...

Страница 15: ...30 Memo ...

Отзывы: