![KITO TCL Series Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/kito/tcl-series/tcl-series_owners-manual_1973940020.webp)
20
Figure 3-7
Chain Container Installation
3.12 Non-Stationary Application
3.12.1 For applications such as rental fleets or construction sites where the hoist is moved from place-to-
place, a filter and lubricator are still required. Consult factory for recommended methods.
3.12.2 Connections and fittings must be kept clean and care taken to prevent dirt, debris and moisture from
entering the hoist.
3.12.3 Recommended practice for removing the hoist from an installation:
1)
Verify the hoist operates correctly by running the hoist briefly (with well lubricated air, if desired),
noting any malfunctions or abnormal noises.
2)
Shut off the air supply to the hoist, bleed off any pressure in the system then disconnect the air
supply line.
3)
Inject a small quantity (approximately 20 drops) of turbine oil (see Section 6.0
) into the hoist’s inlet
port
4)
Plug the inlet port.
3.13 Preoperational Checks and Trial Operation
3.13.1
!
CAUTION
Check for the availability of required operating air pressure of between 60 psi to
90 psi at the hoist's inlet port before trying to operate the hoist.
3.13.2
!
WARNING
Verify that the load chain is not twisted or tangled and that the bottom hook is not
capsized prior to operating the hoist. Correct all load chain irregularities before conducting the first hoist
operation. See Figures 3-8 and 3-9.
Содержание TCL Series
Страница 43: ...43 Figure 7 4 Single Fall Chain Connections Figure 7 5 Double Fall Chain Connections ...
Страница 52: ...10 1 Motor Valve Body and Controls 52 Figure 10 1 Motor Valve Body and Controls ...
Страница 55: ...55 This Page Intentionally Left Blank ...
Страница 56: ...10 2 Brake Gears and Load Suspension Components 56 Figure 10 2 Brake Gears and Load Suspension Components ...
Страница 61: ...61 NOTES ...
Страница 62: ...62 NOTES ...
Страница 63: ...63 NOTES ...