56
6
-
5
3-point hitch implement And loAder operAtion
(1) top link
(2) set pin
(3) lynch pin
(4) top link hook
1. install the top link to the desired
hole, install the set pin and lynch
pin securely.
2. tighten the lock nut on the top link
securely after adjusting top link
length.
1. Adjust the check chain to control
horizontal sway of the implement.
it is also used to set the implement
on the back of the tractor in center.
2. to adjust the check chain, pull out
the turn buckle and adjust it until
the desired transverse moving dis-
tance is obtained.
2
3
2
111
3
d21o602A
d21o603A
ADjusTMENT Of TOP LINk
ADjusTMENT Of CHECk LINk
(1) check chain
(2) turn buckle
(3) set pin
(1) lift rod
(2) turn buckle
(3) lock nut
1. Adjust the implement balance by
turning the lift rod turn buckle.
2. After adjustment, secure it with the
lock nut.
ADjusTMENT Of LIfT ROD
111
22
33
d21o605A
TD210-미국법인향-DK4210,4710,5310,6015 5
2018-03-30 오후 6:41:27
Содержание DK4210(C)HSE
Страница 42: ...MEMO memo TD210 DK4210 4710 5310 6016 6 2019 09 18 4 09 19...
Страница 152: ...MEMO MEMO TD210 DK4210 4710 5310 60118 18 2018 03 30 6 41 40...
Страница 196: ...MEMO memo TD210 DK4210 4710 5310 60144 44 2019 09 18 4 53 51...
Страница 207: ...10 10 INDEX INDEX 10 2 TD210 DK4210 4710 5310 6011 1 2019 10 11 10 59 37...
Страница 214: ...7 TD210 DK4210 4710 5310 6018 8 2019 10 11 10 59 38...