background image

 

Pre-installation Questions and Answers 

 

About curing of the paint 

Your stove or fireplace has been painted with the highest quality silicone stove paint. This paint dries quickly in 15-20 
minutes when first applied at the factory. However, due to the high temperature silicone components, the paint will cure 
when heat is applied to the appliance as it is first used. The following information applies to the curing process to get the 
paint fully hard and durable. 

Fire the appliance four successive times for 10 minutes each firing and a 5 minute cool down between each. Be aware 
during log and firebox paint curing that a white deposit may be developing on the inside of the glass doors. It is important 
to remove this white deposit from the glass doors using a commercial fireplace glass cleaner. 

 

Babies, small children, pregnant women and pets should leave the area during the cure phase. 

 

Ventilate well, open doors and windows. 

 

Do not touch during curing. 

 

Why does my fireplace or stove give off odour? 

It is normal for your fireplace to give off some odour. This is due to the curing of the paint, adhesives, silicones and any 
undetected oil from the manufacturing process as well as the finishing materials used with the installations (e.g. marble, 
tile and the adhesives used to adhere this product to the walls can react with heat and cause odours). 

It is recommended that you burn your gas fireplace or stove for a minimum of four hours at a time with the fan off after the 
curing of the paint has been completed. These odours can last upward to 40 hours of burn time; keep burning at a 
minimum of four hours per use until odours dissipate. 

 

Noise coming from the fireplace? 

Noise is caused by the expansion and contraction of metal as the appliance heats up and cools down. This is normal and 
is similar to the sounds produced by a furnace or heating duct. This noise does not affect the operation or longevity of 
your fireplace. 

 

Operating Instructions 

 

1.  Be sure to read and understand all the instructions in this manual before operation of appliance. 

2.  Ensure all wiring is correct and properly enclosed to prevent possible shock. 

3.  Check for gas leaks. 

4.  Make sure the glass door is properly installed before operation. Never operate the appliance with the glass door 

removed. 

5.  Make sure venting and termination cap are installed and unobstructed. 

6.  If brick or porcelain liners are used, ensure they are installed. 

7.  Verify that the pilot can be seen when lighting the appliance. If not, the log or rock placement is incorrect. 

8.  If the unit is turned off, you must wait a minimum of 60 seconds before re-lighting it. 

2

Содержание FV200NE

Страница 1: ...upplier call the fire department Installation Instructions Model Number FV200 FV200P Free Standing Vented Gas Stove Stock s FV200N FV200LP FV200PN FV200PLP FV200NE FV200LPE FV200PNE FV200PLPE are Cert...

Страница 2: ...sed with the installations e g marble tile and the adhesives used to adhere this product to the walls can react with heat and cause odours It is recommended that you burn your gas fireplace or stove f...

Страница 3: ...ructions 8 9 General Glass Information 9 10 Installation Of Brick Panel Kit 10 Installation Instructions for LOGC200 11 Optional Fan Kit Installation 12 Millivolt System Lighting and Burner Control 13...

Страница 4: ...the appliance 15 Installation and repair should be done by a qualified service person The appliance should be inspected before use and at least annually by a professional service person More frequent...

Страница 5: ...A 720 2005 Edition B A carbon monoxide detector shall be located in the room that houses the appliance or equipment and shall Be powered by the same electrical circuit as the appliance or equipment su...

Страница 6: ...B Vent Manufacturer Installation Instruction Chart The unit should be placed on a hard stable surface The appliance may be installed directly on carpeting tile or other combustible material with no ad...

Страница 7: ...IG 3 5 KPa 9 The appliance must be isolated from the gas supply piping system by closing its individual shutoff valve during any pressure testing of the gas supply piping system at test pressures equa...

Страница 8: ...eries Children and adults should be alerted to the hazards of high surface temperatures of this appliance and should stay away to avoid burns or ignition of clothing Control compartments burners and a...

Страница 9: ...urner areas This appliance should not be used as drying rack for clothing nor should Christmas stockings or decorations be hung near it Under no circumstances should any solid fuels wood paper cardboa...

Страница 10: ...e reinstalled by reversing Steps 1 2 INSTALLATION OF BRICK PANEL KIT 1 Remove glass door as shown in door removal diagram 2 Place back up to rear of firebox leaving bottom of panel slightly forward fo...

Страница 11: ...n picture and slide Log 3 forward up to the locating tabs 3A 3B Do not place log on top of tabs Step 4 Place Log 4 onto notched areas of Logs 1 3 Step 5 Place Log 5 up against 2nd Grate Bar from the l...

Страница 12: ...it reaches operating temperature in approximately 10 to 15 minutes the fan will turn on The fan can be switched off if desired by turning the switch fully counter clockwise 6 Once the fan has started...

Страница 13: ...MILLIVOLT SYSTEM LIGHTING BURNING CONTROL 14 WARNIING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life 13...

Страница 14: ...itch may be replaced with a wall thermostat or remote Terminals on the valve TPTH and TH are for wiring on off switches remotes or thermostats Recommended Maximum Lead Length Double Wire When Using Wa...

Страница 15: ...oper operation Flame should appear similar to the above picture Conversion Kit Instructions PART A Kit Number Description Pilot Orifice Burner Orifice Brass 1000 255 Brass Nipple Air Shutter Hi Lo Reg...

Страница 16: ...to convert the valve from one type of fuel to the other Step 8 Check for gas leaks around the pilot burner tube and face of valve Step 9 Attach conversion label to label plate on bottom of unit writi...

Страница 17: ...e new injector is proper for the application The injector size is stamped on the side of the injector near the top LPG injectors have a groove machined around their circumference near the top while NG...

Страница 18: ...Gas Conversion for Modulator PART C WARNING WARNING 18...

Страница 19: ...the remote Contrary to this feature is a Manual HI LO Control Knob The Modulating Servo Motor requires the Remote system to be present Backup Battery Pack This component permits the IPI system to oper...

Страница 20: ...ol wiring harness instead of the main IPI harness From the Remote wiring harness use its male plug in connector and connect it to the female plug in in the main IPI harness Now the circuit is complete...

Страница 21: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 21...

Страница 22: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 22...

Страница 23: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 23...

Страница 24: ...ent LIGHTING INSTRUCTIONS 1 STOP Read the above safety information on this label 2 Remove batteries from Receiver and or Battery Backup Pack 3 Turn off all electric power to the fireplace 4 This firep...

Страница 25: ...existing chimney is six 6 inches or larger Four 4 inch single wall or B Vent liquid fuel gas chimney or Flex Gas Liner may be used to adapt existing chimney or liner to stove When installing with B V...

Страница 26: ...t Z80PT Thermostat Programmable Digital Millivolt Wall Mount 1 F80 40 Z1RC Remote Control Millivolt On Off with LED Model I ZART Remote Control Thermostat Millivolt Model K DCHS Remote Control Heatshi...

Страница 27: ...tepper Motor NG 1002 P012si Stepper Motor LP 1002 P016is Hi Lo Regulator NG 1002 P014si Hi Lo Regulator LP CONVERSION KITS 200V CKLP Conversion Kit Liquid Propane FV200LP FV200PLP 200V CKNG Conversion...

Страница 28: ...ge Check generator with millivolt meter Take reading at generator terminals of gas valve Should read 325 millivolts minimum while holding valve knob depressed in pilot position and wall switch off Rep...

Страница 29: ...th service or maintenance h damage repairs inoperation or inefficiency resulting from faulty installation or application i electricity or fuel costs or any increase in electricity or fuel cost whatsoe...

Отзывы: