MQZCV34BG Corner Framing Dimensions -Recessed Front Chase- Open Top
Corner Kit Required. Can be used on left or right side of unit.
The top of the chase must have an opening of 3”.
NOTE: These structures are not load bearing.
Framing for Horizontal Vent
Termination
(See
Installation of Side
Wall Venting
Section)
No loose Combustibles (wood, wiring, etc.) are
allowed inside the open Chase area.
LEFT SIDE
Unit and Framing
can be covered
with a combustible
i.e., drywall.
8” MIN from top of pipe
to enclosure top.
No Crossmember
at front of Chase
Open Chase
21”
MAX
TOP VIEW
Cavity between
2 x 4 studs must
be clear of
combustibles.
20
Содержание MQZCVBG34LPE2
Страница 58: ...Gas Conversion for Modulator PART C 58...
Страница 64: ...Proflame 2 Remote Control 64...
Страница 66: ...FAN OPTION NOT AVAILABLE 66...