Kilowatt Labs CENTAURI ENERGY SERVER Скачать руководство пользователя страница 41

 

 

Centauri Energy Server 

 User Manual  

  Model Number - GF-20000-360Vdc-380Vac-3/3 

This manual is subject to change without notice and at the sole discretion of Kilowatt Labs, Inc.

  

Kilowatt Labs, Inc. | 

www.kilowattlabs.com 

 

41 

7. Maintenance: 

7.1 Preventive Maintenance: 

The preventive maintenance can make the system reliability and prolong its service life. 

The following inspections should be conducted every month: 

 

Turn OFF the Energy Server (see the operation steps). 

 

Inspect and make sure that the vent is not blocked. 

 

Inspect whether there is too much dust on the cover. 

 

Inspect whether the connecting cables of input, output and the battery are connected firmly and 

whether the insulation layer of the cables is in good condition. 

 

Ensure that the product is not affected with damp. 

 

Start-up operation (ON/OFF operation for the product). 

 

7.2 Maintenance of Battery: 

The  sealed  battery  (lead-acid  or  lithium-ion)  is  used for  the maintenance  of  the  Energy  Server.  Its 

service life will be shortened dramatically with the preservation and use environment, the discharge 

frequency of the battery and the temperature rise. Even if the battery is not used, its performance will 

gradually decline, therefore it is recommended that one discharge test (Make sure the battery test 

should be executed in the condition of the normal bypass power supply) is conducted every three 

months when there is no power outage for a long term. The inspection methods of the battery are 

shown as  follows  (At  the end  of  the  use  limit of  the  battery,  the  battery  performance  will  decline 

sharply, therefore be sure to keep in mind the following inspection and maintenance methods): 

 

1.

 

Click the 

 button on the main interface of the display screen to select the 

BAT TEST

” 

option 

and  then  input  the 

Control 

Password”

 

The  default  password  is:  87654321)  and  click 

YES

 

button to choose 

Battery Self-check

 option. At this point, the Energy Server closes the MPPT 

and the rectifier; the battery discharges; the 

REC

 LED on the panel is OFF; the 

“MPPT” red light 

is ON and the 

BAT

 LED flashes in green. 

2.

 

When the Energy Server detects the low voltage alarm of the battery (The depth of discharge can 

be adjusted by itself), and the 

battery manual maintenance succeeds

 information is indicated 

on the lower left corner of the LCD panel, it shows that the battery manual maintenance has been 

completed. After the completion of the manual maintenance, the Energy Server and the rectifier 

are  started  normally,  and  the  output  is  continuously  switched  to  the  AC  inverter  output  and 

Содержание CENTAURI ENERGY SERVER

Страница 1: ...CENTAURI ENERGY SERVER User Manual Model number GF 20000 360Vdc 380Vac 3 3 Version 1 0 Release Date October2019 Author Mamoona Khalid BS EE MS EEE...

Страница 2: ...ity power supply featuring stable voltage and frequency even in the cases of a sudden change of AC input voltage and AC frequency over under voltage Legal Provisions No part of this User Manual Manual...

Страница 3: ...lection Button Function 15 3 4 2 Description of Function Buttons 16 3 5 Introduction of Breaker 17 3 6 Introduction to Line Bank 18 3 7 Description of Remote Control Signal Input 18 3 8 Description of...

Страница 4: ...5 5 1 3 Input Setup of Battery Parameters 33 5 5 1 4 Password Setting 34 5 5 1 5 Other Settings 35 5 5 2 User Setup 35 5 5 2 1 MPPT Setup 35 5 5 2 2 INV Setup 35 5 5 2 3 Off Peak Setup 35 5 5 2 4 Prot...

Страница 5: ...tem Control Panel 10 Fig 4 Description of Touch Screen 10 Fig 5 Schematic Diagram of System Installation 22 Figure 6 Schematic Diagram of System Handling 23 Fig 7 Signal Interface of Remote Control 28...

Страница 6: ...f Button Symbol of touch screen 14 Table 2a System LED and Alarm 1 15 Table 2b System LED and Alarm 2 15 Table 3 Description of selection Buttons 16 Table 4 Description of Function Buttons 16 Table 5...

Страница 7: ...oltage may be still high for a long time please do not open the cabinet because it may cause an electric shock The Manual Bypass switch is used for maintenance and repair of the product therefore auth...

Страница 8: ...F grid photovoltaic power generation system mainly consists of the PV Panels combiner box Energy Server Battery and Load The solar energy of the PV panels is sent to the combiner after converging sola...

Страница 9: ...Vac 3 3 This manual is subject to change without notice and at the sole discretion of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 9 Fig 1 Composition of Off grid Photovoltaic System 2 3 S...

Страница 10: ...s manual is subject to change without notice and at the sole discretion of Kilowatt Labs Inc Kilowatt Labs Inc www kilowattlabs com 10 3 Description of Product Control 3 1 Control Panel Fig 3 System C...

Страница 11: ...HZ Frequency Output parameters Phase Voltage V Output phase voltage of inverter Phase Current A Output phase current of inverter Frequency HZ Output frequency of inverter Power factor Power factor of...

Страница 12: ...inside the Energy Server Battery Status Battery pack switch is opened System Generated Energy Generated power Current total system generated power Daily Generated Energy Daily gross generation of the...

Страница 13: ...operating parameters of the rectifier Input parameters of bypass Press this button to view the bypass input operating parameters O P Output parameters Press this button to view the system output oper...

Страница 14: ...ion above Delete button Press this button to delete the operation Table 1b Description of Button Symbol of touch screen 3 3 STATUS System Warning LED and Warning SYS LED Status Function Description Bu...

Страница 15: ...not booted OFF under voltage OFF charging of part of MPPT Module REC Rectifier LED REC input fault Running normally Rectifier shutdown Rectifier is starting INV Inverter LED INV fault The inverter can...

Страница 16: ...Description of Function Buttons Button Symbols Name Functions INV ON ON button When this button is pressed the system executes the boot command and then runs after pressing the OK button INV OFF OFF...

Страница 17: ...pass input by switching ON this button OUTPUT Output switch Turning ON the output breaker will make a connection between the load and the system static switch BYPASS Bypass switch Turn ON the Bypass b...

Страница 18: ...PV 4 Input terminals pole AC INPUT R line S line and T line of rectifier input terminal BYPASS INPUT R line S line T and N line of bypass input terminal AC OUTPUT R line S line T line and N line of sy...

Страница 19: ...Remote Control Signal Input 3 8 Description of Output Signal at System Dry Contact English Name Chinese name Normally Closed Nodes Normally Opened Nodes FAN FAULT Fan fault Fan normal Fan fault SYSAL...

Страница 20: ...ust be provided with the professional engineers authorized by the company for the guidance of installation Ground the Energy Server properly and turn OFF all switches before making electrical connecti...

Страница 21: ...ocation or other damage in transportation on the internal or external surface of the Energy Server and the battery If there is any damage do not install or use the system please notify the carrier for...

Страница 22: ...A C system 2 To facilitate the wiring daily maintenance diagnosis and repair of the Energy Server please make sure that the safe space of the front and the back doors is reserved The advisable space i...

Страница 23: ...ion location Figure 6 Schematic Diagram of System Handling 4 6 Requirements of Battery Configuration Chemical Battery The ambient temperature of the battery directly affects the service life of the ba...

Страница 24: ...es open the front door of the Energy Server unpack the downside baffle you will see the connection bar connected with the power cable 4 8 Requirements of External Distribution Make sure that the power...

Страница 25: ...nection according to local related standards and table 9 The length of the cables should be limited to 2 10 meters because too long cable can lead to the low voltage otherwise the cross section area o...

Страница 26: ...to make sure that the input switch of the Energy Server is in OFF state 3 Connect the protective grounding cables and other necessary grounding cables to the connectors of the ground lines at the bott...

Страница 27: ...of rectifier power supply the bypass power supply and the battery pack are switched on and then use the multimeter to test and make sure that the voltage and polarity of the system comply with the rel...

Страница 28: ...ttlabs com 28 Fig 7 Signal Interface of Remote Control The output signal interface dry contact belongs to 3Pin interface therefore the user can choose the normally open mode or normally closed mode as...

Страница 29: ...onnel given the technology license by the company can open the protective cover plate of Energy Server 5 1 1 Daily on Steps 1 Switch ON the output switch of the battery 2 Switch ON the input switch of...

Страница 30: ...the RECTIFIER and BYPASS input switches of the external power of the Energy Server 7 Switch OFF the switches of the battery 5 2 Emergency Stop Operation In case of an emergency such as an electric sh...

Страница 31: ...please click button on the main interfaces USER button input password the default password is 87654321 and button and then enter INV SET interface MANU BYP interface successively to select ON option a...

Страница 32: ...fault protection 5 4 3 Exit Service Mode When the maintenance work is complete the state of no fault protection of AC power for the load is switched into the state with the power supply protection by...

Страница 33: ...ion steps of PV automatic power on Click the AUTO ON button to turn ON or turn OFF this function The system is in OPEN status by default 5 5 1 3 Input Setup of Battery Parameters Operation Method Clic...

Страница 34: ...he operation Setup of Temperature Configuration Click on TEMPCMP button to enter the corresponding setting interface The default setting of the system is 2 mV but the engineers can choose the appropri...

Страница 35: ...ear away all historical information 5 5 2 User Setup Operation method Click the USER button and enter the password to enter the corresponding setting interface The user setting operation can only be d...

Страница 36: ...GE button to select the desired language 5 5 2 6 Setup of Date and Time The system will enter the USER interface by clicking the setup icon on the main interface click the Date time button to set the...

Страница 37: ...When PV Power is higher than load power it will supply power to the load first and the extra power will be used to charge the battery In this case if PV charge current is high enough AC will not be us...

Страница 38: ...ils the PV power will support the load first and the extra power will be used to charge the battery Fig 11 AC Abnormal Mode 1 2 When the PV power is less than the load power and AC fails the PV togeth...

Страница 39: ...or battery low voltage in power supply priority mode the rectifier will turn OFF AC charger in set time PV and rectifier will supply the load first and PV extra power will be used to charge the batter...

Страница 40: ...com 40 3 Energy storage priority System will turn on rectifier according to user settings Load and battery will be supplied by PV and rectifier Fig 15 Off Peak Setup Mode 3 6 4 System failure 1 When t...

Страница 41: ...gradually decline therefore it is recommended that one discharge test Make sure the battery test should be executed in the condition of the normal bypass power supply is conducted every three months...

Страница 42: ...e discharge time decreases accordingly The battery should be tested every month instead of 3 months 5 Dustproof treatment Remove the dust and dirt on the battery Check whether all internal wires of th...

Страница 43: ...erter is shut down for protection Output Over Load The load is more than 105 Get the load shedding to be less than 90 REC Fault After the rectifier is started the rectified voltage is lower than the s...

Страница 44: ...h the requirements of the Energy Server and whether the switches are in normal operation BYP Phase Abnormal The bypass phase sequence is reverse Adjust any two phases of the system input lines Bypass...

Страница 45: ...tton for recovery EPO Press the red button on the panel or conduct the remote EPO operation Remove the remote EPO order and execute the OFF operation steps and then execute the ON steps after the syst...

Страница 46: ...k the local authorized technician for service Over Current The power of PV polar plate is too high and there is instant overcurrent Check whether the power of the polar pole confirms to the system rat...

Страница 47: ...ates in series PV under voltage Poor illumination Confirm the direction and the pavement gradient of the polar plate MPPT is not detected MPPT shutdown of the communication blackout The MPPT system sh...

Отзывы: