For information about operating the Sol-Ark Hybrid inverter, see the SOl-Ark Owner’s Guide .
NOTICE
RISK OF BATTERY AND INVERTER DAMAGE
IF PROGRAMMED TO SMART LOAD
DO NOT CONNECT GENERATOR TO GEN PORT
Failure to follow these instructions can result in equipment damage
4.
Decide Critical Backup Circuits
a. If using a 10-circuit switch: decide which 10 circuits will be on backup-power
continuously. These circuits must use non-GFI breakers to work with the transfer switch.
You can replace a GFI breaker with a normal breaker, installing GFI outlets instead
(or you can move GFI breaker into 10-circuit SW). If applicable, low load circuits can be
combined.
b.
Important: Make sure to keep within inverter amperage limits
(per inverter):
On Grid = 50A continuous (pass-through)
Off Grid = 33A continuous/83A peak
c. Verify each load circuit by measuring typical and max Amps with a clip-on Amp meter.
Amps x 120V = Watts
d.
If you have Arc-Fault / GFI breakers in your main panel we recommend that you
install a sub panel for your backup loads, not a multi-circuit transfer switch.
e.
If using multiple 12K units in parallel consider powering the main breaker panel
directly as shown on page 15. (Example: 3 systems will have a total of 150A of
pass through @ 240V).