August 1999
76-100016-001
PEGAsys
Intelligent Suppression Control/Fire Alarm System
7-4
7-7.2
Relay Output Module
The following paragraph provides the step-by-step procedure
to install a relay output module into the
PEGAsys
system.
a.
Remove the relay output module from packing and inspect
for physical damage.
b.
Set address switches. Refer to Drawing No. 06-235443-
007 in Appendix I for address switch settings.
c.
Install module onto the motherboard. Ensure the connec-
tor mates properly.
d.
Insert and tighten mounting screws. Refer to appropriate
Figure 5-1 or 5-2.
7-7.3
Agent Release Module
The following paragraph provides the step-by-step procedure
to install a agent release module into the
PEGAsys
system.
a.
Remove the agent release module from packing and
inspect for physical damage.
b.
Set address switches. Refer to drawing 06-235443-
005 in Appendix I for address switch settings.
c.
Set switches S3 & S4 for solenoid or initiator activa-
tion (refer to drawing 06-235443-005 in the back of the
manual for switch settings).
d.
Cut jumper between W1 & W2 if using an auxiliary
24VDC power input.
e.
Install module onto the motherboard. Ensure the con-
nector mates properly.
f.
Insert and tighten mounting screws. Refer to appropri-
ate Figure 5-1 or 5-2.
7-7.4
City-Tie Output Module
The following paragraph provides the step-by-step procedure
to install a city tie output module into the
PEGAsys
system.
a.
Remove the agent release module from packing and in-
spect for physical damage.
b.
Set module configuration. Refer to drawing 06-235443-008
in Appendix I.
c.
Install module on the motherboard. Ensure the connector
mates properly.
d.
Insert and tighten mounting screws. Refer to appropriate
Figure 5-1 or 5-2.
7-7.6
Power Supply/Charger Assembly
The following paragraph provides the step-by-step procedure
to install a power supply/charger assembly into the
PEGAsys
system.
a.
Remove the power supply/charger assembly from packing
and inspect for physical damage.
b.
Set address switches. Refer to drawing 06-235443-003 in
Appendix I for address switch settings.
c.
Identify module revision by referring to Figures 3-5 and 3-
6.
d.
Ensure the wiring connections between the switching power
supply (Aux. Power Supply) and monitor module (Main
Power Supply) are accomplished in accordance with the
appropriate Figure, Figure 7-6 or 7-7.
e.
Set jumpers in accordance with Drawing No. 06-235443-
003 (located in the back of this manual).
f.
Install module in the desired position on the back plate of
the main or extension enclosure.
g.
Insert and tighten the four mounting screws/nuts into the
four corners of the mounting plate.
7-7.7
Power Supply/Charger Assembly, Expansion
Enclosure
The following paragraph provides the step-by-step procedure
to install a power supply/charger assembly into the expansion
enclosure.
a.
Remove the power supply/charger assembly from packing
and inspect for physical damage.
b.
Set address switches. Refer to Drawing No. 06-235443-
003 in Appendix I for address switch settings.
c.
Identify module revision by referring to Figures 3-5 and 3-
6.
d.
Ensure the wiring connections between the switching power
supply (Aux. Power Supply) and monitor module (Main
Power Supply) are accomplished in accordance with the
appropriate Figure, Figure 7-8 or 7-9.
attribute?
attribute?
attribute?
attribute?
attribute?
attribute?
attribute?
attribute?
attribute?
attribute?
AC OUT
1
AC IN
2
24V
RET
N
L
N
L
N
DC IN 1
L
G
SPV
attribute
?
attribute
?
attribute
?
attribute
?
24V
RET
DC
IN
2
SHARE
WHT
BLK/WHT
BLK
BLK
RED
RED
ORN
WHT
BLK/WHT
ORN
RED
BLK
BLK
RED
MAIN POWER SUPPLY
(76-100009-001)
AUXILIARY POWER SUPPLY
(76-100009-002)
RET
Figure 7-6. Power Supply/Charger (Rev A), Wiring Diagram
Содержание PEGAsys
Страница 2: ......
Страница 4: ......
Страница 6: ...ii THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 16: ......
Страница 154: ...220423 KIDDE FENWAL Inc 400 Main Street Ashland MA 01721 Attn Documentation Manager Place Stamp Here FOLD FOLD ...
Страница 155: ......