October 2014
x
06-236115-001
TABLE OF CONTENTS (CONT.)
Main and Reserve System ...................................................................... 4-29
Installation of Electric Control Heads ....................................................... 4-29
Installation of Pressure Operated Control Head, P/N 82-878751-000............ 4-31
Installation of Electric/Cable Operated Control Head,
P/N 81-895630-000 and P/N WK-897494-000 .......................................... 4-32
Installation of Cable Operated Control Head, P/N 81-979469-000 ................ 4-33
Installation of Lever Operated Control Head, P/N WK-870652-000............... 4-33
Installation of Nitrogen Cylinder, P/N WK-877940-000 and
Mounting Bracket, P/N WK-877845-000 ................................................... 4-34
Installation of Pressure Switch, P/N 81-486536-000 and
Installation of Pressure Trip, P/N 81-874290-000 ...................................... 4-35
Installation of Manual Pull Station, P/N 81-871403-000.............................. 4-35
Installation of Discharge Indicator (P/N 81-875553-000)............................ 4-35
Installation of Supervisory Pressure Switch (P/Ns 06-118262-001 and
Installation of Pressure Switch 06-118262-001 ......................................... 4-38
Installation of Pressure Switch 06-118263-001 ......................................... 4-38
Maintenance Procedures ........................................................................ 5-1
Preventative Maintenance ...................................................................... 5-2
Check HFC-227ea Cylinder Pressure ........................................................ 5-2
Check Nitrogen Cylinder Pressure............................................................ 5-2
Inspect Pressure Control Heads .............................................................. 5-3
Inspect Electric Control Heads ................................................................ 5-3
Inspect Cylinder and Valve Assembly....................................................... 5-3
Inspect Brackets, Straps, Cradles and Mounting Hardware.......................... 5-3
Inspect Discharge Hoses ........................................................................ 5-3
Inspect Discharge Nozzles...................................................................... 5-4
Inspect Pressure Switches...................................................................... 5-4
Inspection Procedures, Semi-Annual........................................................ 5-4
Check HFC-227ea cylinder weights and pressures ..................................... 5-6
Cylinders Not Equipped with Flexible Tape Liquid Level Indicator ................. 5-6
Содержание ECS
Страница 3: ......
Страница 9: ...THIS PAGE INTENTIONALLY LEFT BLANK October 2014 vi 06 236115 001 ...
Страница 19: ...October 2014 xvi 06 236115 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 25: ...October 2014 1 6 06 236115 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 63: ...Component Description October 2014 3 36 06 236115 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 103: ...Design and Installation October 2014 4 40 06 236115 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 137: ...Post Discharge Maintenance October 2014 6 18 06 236115 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 148: ...P N 06 236115 001 A 1 October 2014 APPENDIX A MATERIAL SAFETY DATASHEETS ...
Страница 167: ...October 2014 A 2 P N 06 236115 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 168: ......
Страница 171: ......
Страница 173: ...July 2016 ii 06 236115 003 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 186: ......
Страница 189: ......
Страница 191: ...August 2016 ii 06 237553 001 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 198: ......
Страница 201: ......
Страница 203: ...May 2016 ii 06 236115 004 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 211: ...May 2016 8 06 236115 004 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 212: ......