Installation Note N5242-90010 33
Description of the Upgrade
All Instruments
Step 16. Install the Bulkhead Connectors in the Test Set Front Plate
(For Analyzers with Serial Numbers Prefixed MY/SG/US5310 and
Below)
If your analyzer’s serial number is MY/SG/US5321 and above, ignore this step.
Refer to
for this procedure. Some bulkhead connectors may already
be installed on your analyzer’s front plate. New parts are listed in
.
1. From the back side of the test set front plate, insert a bulkhead connector
into a hole in the plate.
2. Install 1x washer and 1x nut. Hand tighten nut and ensure bulkhead
connector hexagon nut, on the back side of test set front plate, is aligned
to the test set subpanel hexagon indent.
3. Repeat previous two steps for the remaining bulkhead connectors.
4. Torque nuts, on the front side of test set front plate, to 21 in-lbs.
5. Torque test ports 1 and 2 mounting nuts to 72 in-lbs.
Figure 12
Bulkhead Connectors Installation