Table of Contents
Step 1: Unpack and Inspect the Module
Step 2: Verify the M9202A Shipment Contents
Step 5: Verify Operation of the M9202A Module
Conduct M9202A Operational check (optional)
Operational Verification Procedure
Table of Figures
Figure 1 - A typical ESD workstation
Figure 2 - Shipment contents table
Figure 3 - Installing a module into a PXI chassis
Figure 4 - Agilent Connection Expert (ACE)
Figure 5 - Soft Front Panel (SFP) showing results of Self-Test