Keyscan Inc. A Member of the Kaba Group – CA8WL-AL Rev. B Installation Guide (07.15)
27
Within 5 seconds of establishing the connection, the CA8WL-AL should receive power from the PoE
source and begin booting up. The system status LED illuminates in amber and the on-board piezo
emits a beep.
Using a voltmeter, check the following terminals on the CA8WL-AL for +12V DC:
POWER OUT + (TB6)
DC Power 12V DC
Ensure the right cover on the CA8WL-AL control board has been removed.
Connect the +12V DC power supply to the POWER IN terminals (TB6) on the CA8WL-AL.
Upon applying power, the CA8WL-AL begins booting-up. The system status LED illuminates in amber
and the on-board piezo emits a beep.
Using a voltmeter, check the following terminals on the CA8WL-AL for +12V DC:
POWER OUT + (TB6)