VFHOMT-11/18 -
27
Packing List
Preparation
1. Place, level, and install
Base Unit Assembly
that will support the
Fume Hood
as shown on page 27.
2. Attach the
Fume Hood Worksurface
to the
Base Unit Assembly
at the corners using epoxy cement or similar
adhesive.
NOTICE
Worksurface should be centered on units and overhang the front by 1½". Worksurface must
be level. Shim as needed. Top should extend all the way to rear wall.
3. Uncrate
Fume Hood
taking care to sort and inventory all parts.
4. Remove
End Panels
from
Fume Hood
(by lifting up and out) and remove screws anchoring
Fume Hood
to pallet and
Weight Box
to
Fume Hood
.
5. Remove all packing from
Fume Hood
and any tape holding parts in place for shipping.
NOTICE
Fume Hood is packed fully assembled. The
Top Front Panel
may be removed (by lifting up
and out) to fit through narrow doorways and/or for easier access.
NOTICE
Generally electrical fixtures and plumbing fittings are shipped installed, but may be shipped
loose depending on job requirements. Fittings may also be prewired and/or prepiped.
Fixtures are not shown on assembly diagram as quantities and locations vary to meet
individual requirements.
Installation
6. Check that
Sash Belts
are properly routed over front and rear pulleys, and engage pulley sprockets.
7. Perform sash adjustments and troubleshooting if needed, before placing hood on worksurface.
(see page 12)
CAUTION
!
Handle Sash with care - Glass will crack if abused.
CAUTION
!
Do not lift fume hood by the Lower Airfoil, Venturi Ports, or any other parts
on the front of the hood.
8. Using as many workers as needed, lift assembled
Fume Hood
,
by its
Lift Points
,
and place on the front of the
leveled
Worksurface
. Slide the hood back into place making sure the left and right
End Liner Panels
are seated in
Worksurface Rabbets
and keeping the front of the hood elevated
to allow the
Lower Airfoil Weld Nuts
to engage the
slots in the front of the
Worksurfac
e.
TIP:
The
Rear Lifting Channel
at the rear of the hood is designed to accept a standard
two-by-four. Use of a two-by-four can be helpful in lifting the hood when space allows.
TIP:
Place cardboard panels between bottom of
Fume Hood
and
Worksurface
to allow the hood
to slide easier and to protect the Worksurface. Remove cardboard after hood is in place.
On Pallet
Fume Hood
Hardware Package (taped to side of hood)
NOTICE
Fume Hood Worksurface is packaged separately.
Hardware Package
(4-8)
5/16"-18 x 1" Low Profile Socket Head Cap Screw
(6)
#8 x 1/2" Oval Head Self-tapping Screw
(1)
Installation Instructions
Installation Instructions
Supreme Air Venturi Bench Fume Hoods
continued on next page
Содержание Supreme Air Series
Страница 43: ...VFHOMT 11 18 41...