Installation
45 / 144
2014/12
3.7.2 Inside a building
The chamber must not be installed in a spot where it
FRXOGLQÁXHQFHDGMDFHQWIRXQGDWLRQVLHPLQLPXP
GLVWDQFH GLIIHUHQFHLQKHLJKWEHWZHHQWKHERWWRPHGJH
of the chamber and bottom edge of the foundation / tan
у+,QDGGLWLRQWKHFRQFUHWHVODEQHDUWKH
FKDPEHUPXVWQRWEHXVHGIRUFDOFXODWLQJWKHWUDIÀFORDG
for the building.
Underneath the concrete slab near the chamber area
and overlapping the area by around 20 cm, a layer
RISRO\VW\UHQHDSSUR[FPWKLFNPXVWEHLQFOXGHG
in order to prevent any settling of the concrete slab
leading to large vertical loads in the chamber. Otherwise
the chamber could have the effect of a stake. For this
standard case, the cone is assumed to be below the
polystyrene layer.
If the cone is in the transition area of the concrete slab,
VHSDUDWLRQPXVWEHE\PHDQVRIDPRYLQJMRLQWW
FPDQGWKHSRO\VW\UHQHOD\HUPXVWEHÀWWHGDERYHWKH
chamber area as described above.
a
30°
H
Ill. [24]
5cm Styroporschicht
20 cm
Ill. [25]
Bodenplatte
5cm Styroporschicht
Ill. [26]
Содержание Aqualift S LW 1000
Страница 23: ...Technische Daten 23 144 2014 12...
Страница 47: ...Technical data 47 144 2014 12...
Страница 71: ...Caract ristiques techniques 71 144 2014 12...
Страница 95: ...Dati tecnici 95 144 2014 12...
Страница 119: ...Technische gegevens 119 144 2014 12...
Страница 143: ...DQH WHFKQLF QH 143 144 2014 12...