36 / 144
Installation
2014/12
3.3.2 Connecting the pipework system for Ecolift XL
• Establish connections as follows:
–
,QÁRZ!
–
2XWÁRZ!
– Pressure pipe <24>, see Fig. [9] and Fig. [10]
• Continue at 3.4
Routing the pressure pipe above the
backwater level
Routing of the pressure pipe directly into the
sewer pipe
Ill. [9]
Sewer pipe
L1
L2
DN 100
20
35
DN 125
21.5
33.5
DN 150
24
28.5
DN 200
32.5
22.5
L2
500
L1
X
Ill. [10]
23
26
Ill. [8]
Содержание Aqualift S LW 1000
Страница 23: ...Technische Daten 23 144 2014 12...
Страница 47: ...Technical data 47 144 2014 12...
Страница 71: ...Caract ristiques techniques 71 144 2014 12...
Страница 95: ...Dati tecnici 95 144 2014 12...
Страница 119: ...Technische gegevens 119 144 2014 12...
Страница 143: ...DQH WHFKQLF QH 143 144 2014 12...