34 / 144
Installation
2014/12
3.2
Setting the base element in place
Information for crane transport:
–
Always use 4 load hooks.
–
0D[LPXPORDGEHDULQJFDSDFLW\RIORDGKRRNVNJ
–
Use a shackle with a 16 mm bolt diameter.
–
The crane chain or slip neck to the individual load point must be at
least 1 m long <A>.
–
Do not leave loads suspended from the crane for longer than one
hour.
•
$OLJQWKHEDVHHOHPHQWKRUL]RQWDOO\LQWKHH[FDYDWLRQSLW6OLJKWGHYLDWLRQVDUHQRWLFHGVLJQLÀFDQWO\ULJKWWRWKH
WRSRIGHHSFKDPEHUV7KHVSDFHUHTXLUHGIRUWKHIRRWSULQWRIWKHEDVHHOHPHQWERWWRPRIWKHH[FDYDWLRQSLW
must be in contact with the base element across the whole of its surface.
•
8VHOHDQFRQFUHWHWRÀ[WKHEDVHHOHPHQWLQSODFHDWWKHVLGHVHH)LJ>@
A
Ill. [5]
Содержание Aqualift S LW 1000
Страница 23: ...Technische Daten 23 144 2014 12...
Страница 47: ...Technical data 47 144 2014 12...
Страница 71: ...Caract ristiques techniques 71 144 2014 12...
Страница 95: ...Dati tecnici 95 144 2014 12...
Страница 119: ...Technische gegevens 119 144 2014 12...
Страница 143: ...DQH WHFKQLF QH 143 144 2014 12...