KERR KD Gemini Скачать руководство пользователя страница 9

KD GEMINI – INSTALLATION/OPERATION MANUAL 

 

KD Gemini

 

 

 

May-06 

8

3.9  BLOWER SETTINGS 

 

Ensure power is off when adjusting blower setting

.  For heating, use the blower 

speeds shown on the furnace specifications to give a rise of 70  - 85°F.  The #4 Lo 
blower speed can be used for air circulation when neither heating nor cooling are 
required.  Set blower speeds to match the installation requirement. 

 

3.10  COOLING – A/C MODELS

 

 

Air Conditioning models include a fan centre relay wired to run the blower at #1 Hi 
speed when the cooling cycle is operating.  For normal operation, select “AUTO” on the 
T87F thermostat.  When “FAN ON” is selected the blower runs constantly at the cooling 
speed.  See “OFF CYCLE AIR CIRCULATION”.  For air conditioning, the blower on #1 
speed will provide 1300 CFM at 0.50 in. wc static pressure.  

Height of the coil above 

the heat exchanger shall be no less than 4” (100 mm).

 

 

3.11  HUMIDIFIER 

 

If a humidifier is installed ensure that no water can drip or run from it into the furnace.  
This would cause deterioration and void the furnace warranty.   

 

3.12  THERMOSTAT ANTICIPATOR SETTING 

 

Thermostat anticipator setting should be 0.2 amps for any burner.  Check that the 
thermostat anticipator setting matches the primary control circuit current draw.  This 
setting affects the thermostat’s response to the control. 

 

3.13  BLOCKED VENT SWITCH

 

 

ONLY APPLICABLE IN CANADA 
NOT APPLICABLE FOR DIRECT VENT SYSTEMS 

 

SWITCH

 

The  blocked vent  switches are  flue gas  spillage safety  devices.  They 

OPERATION 

detect spillage of flue gas products due to a blocked flue system or 
inadequate draft.  The switch senses the spillage of hot flue gases and 
de-energizes the system’s burner control.  

NEVER reset the blocked 

vent switch, unless the cause of the blockage has been corrected. 

 

INSTALLATION

 

1.  Pierce a 5/8” hole into the flue vent pipe near the appliance breech connection. 
2.  This hole must be at least 10” before the draft regulator, top vertical or horizontal. 
3.  Remove one of the securing nuts from the threaded tube of the safety switch. 
4.  Tighten the other securing nut onto the pipe as far as possible. 
5.  Insert the threaded tube end into the pierced hole of the flue vent pipe. 
6.  Install the securing nut on the safety switch tube, which protrudes into the flue 

vent pipe.  “Tighten the nut securely. 

 
 
 
 
 

Содержание KD Gemini

Страница 1: ...AT MAY DIFFER FROM THIS MANUAL Please read this complete manual before beginning installation These instructions must be kept with the furnace for future reference CERTIFIED TO CAN CSA Std B140 0 Std...

Страница 2: ...ement Venting Ventilation 5 3 5 Installation 5 3 6 Assemble Install Burner 6 3 7 Changing Nozzle 6 3 8 Set Up Burner For Efficient Operation 7 3 9 Blower Settings 8 3 10 Cooling AC Models 8 3 11 Humid...

Страница 3: ...se new approved disposable filters of the same size and type or clean permanent filters according to manufacturer s instructions Replace the filters or clean the filters more often if dusty conditions...

Страница 4: ...hat has been shut down for an extended period of time INSPECTION Have the furnace system serviced and inspected by a qualified technician CHECK Furnace system has not been tampered with FUEL ON Turn o...

Страница 5: ...ANY OTHER APPLIANCE 3 3 INSTALLATION CODES INSTALLATION MUST COMPLY WITH THE REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION All local and national codes governing the installation of oil burning equ...

Страница 6: ...g decal for approved vent flue pipe sizes Maximum flue gas temperature is 575 F THROUGH THE This Furnace is approved for Kerr Direct Vent WALL VENTING COMBUSTION Install openings and ductwork to the f...

Страница 7: ...heck for clean seating and tighten in nozzle adaptor CHECK See burner manufacturer s instructions for correct setting ELECTRODES INSERTION See GENERAL SPECIFICATIONS or diagram Figure 1 LENGTH MOUNT B...

Страница 8: ...a stable symmetrical flame After 15 minutes of normal operation check SMOKE for 0 trace reading and measure CO2 Re adjust the burner controls as required When the burner is set lock the adjustments wi...

Страница 9: ...nty 3 12 THERMOSTAT ANTICIPATOR SETTING Thermostat anticipator setting should be 0 2 amps for any burner Check that the thermostat anticipator setting matches the primary control circuit current draw...

Страница 10: ...struction and the heating system tested on a long burn cycle 7 If the block vent switch shuts down the system check to ensure there is enough draft in the chimney and venting pipes 3 14 FAN CONTROL LI...

Страница 11: ...tight as possible Use a pipe joint compound suitable for oil on all pipe threads To reduce possibility of air leaks tighten stem packing gland nut on any valves installed in the suction line Also be s...

Страница 12: ...5 2 84 0 60 60B 3 5 0 0 88 000 26 850 950 4 3 0 92 3 48 0 75 60W 150 5 0 1 5 105 000 31 1080 1200 3 2 KDF R E 115 A3 Riello 40 F3 1 00 3 81 0 75 60W 175 5 0 1 5 116 000 34 1080 1300 3 1 KDF R E 130 A3...

Страница 13: ...2 wc External static AC 0 5 wc Cooling Air Flow 3 tons Maximum air temperature rise 85 F Fan Control 130 F ON 100 F OFF High Limit max design outlet temp 200 F 1 3 hp 1 speed 0 50 static 1300 CFM MOT...

Страница 14: ...fied for use with Kerr Direct Vent Certified for use with Kerr KPV SS1C through the wall mechanical vent system 10 0 TROUBLE SHOOTING GUIDE Furnace will not start Tripped blocked vent switch Clear ven...

Страница 15: ...hrough Change or insulate ductwork Unheated spaces Low speed switch is on Switch off blower low speed FAN OFF set low Fan control Set FAN OFF higher Motor speed set too high Reset motor speed to slow...

Страница 16: ...__________________________ START UP TEST RESULTS Nozzle ________________________________________ Pressure _______________________________________________ Air __________________________________________...

Страница 17: ......

Страница 18: ...KDF 14A Filter Frame Assembly K00 CB 0025 00 KDF 15 Rear Cabinet Top KD KC KD0 CB 0020 00 KDF 16 Blower Door 3BU 10 00DD 00 KDF 17 Delhi GT10 DD Blower 4CA 00 505M 23 KDF 18A Motor Run Capacitor 5 mi...

Страница 19: ......

Страница 20: ...KDR 14A Filter Frame Assembly K00 CB 0024 00 KDR 15 Rear Cabinet Top KD0 CB 0020 00 KDR 16 Blower Door K00 CB 0103 00 KDR 17 5 Flue Pipe Collar 3BU 10 00DD 00 KDR 18 Delhi GT10 DD Blower 4CA 00 505M 2...

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Отзывы: