TECHNICAL
DATA
SHEET
T.D.S.
NO.
4.3
PCN:
______
Supercedes
PCN:
_____
Date
03
‐
10
‐
06
TITLE:
LONG
TERM
STORAGE
PREPARATION
PROCEDURE
1.0
SCOPE
This
procedure
applies
to
Kerr
Pumps
ONLY.
Storage
procedures
for
any
other
unit
components
or
accessories
(gear
reducers,
engines,
etc.)
are
to
be
prepared
to
the
specific
manufacture’s
recommendations.
1.1
Long
‐
term
storage
is
defined
as
storage
and/or
transient
time
exceeding
six
(6)
months
in
an
environment
defined
in
Paragraph
2.
If
storage
for
less
than
six
months
is
expected,
the
Short
Term
Pump
Storage
Preparation
Procedure
should
be
followed.
1.2
Kerr
Pumps
will
only
prepare
for
short
term
storage
if
so
specified
in
the
purchaser
or
customer
order
control
document.
2.0
STORAGE
ENVIRONMENT
A
minimal
environmental
condition,
to
be
met
by
the
customer
or
purchaser,
is
a
closed
shelter
to
eliminate
effects
of
sun,
wind,
sand
or
other
debris.
Large
temperature
and
humidity
changes
should
be
avoided
to
prevent
preventative
deterioration
or
contamination
by
moisture.
3.0
RUST
PREVENTATIVE
PRODUCT
3.1
The
recommended
rust
preservative
should
protect
the
internal
power
end
parts
from
corrosion
due
to
atmospheric
moisture,
and
may
be
left
in
the
pump
when
filled
with
appropriate
lubricant
and
placed
into
service.
The
elevated
temperature
of
service
will
cause
rapid
depletion
of
the
preventative
protection.
3.2
The
following
rust
preventative
products
or
their
equivalents
are
recommended
for
use
in
Kerr
Pumps
and
usually
available
in
5
gallon,
55
gallon
containers:
CITGO:
RUST
‐
O
‐
LINE
OIL
10
SHELL:
ENSIS
OIL
N
4.0
PROCEDURE
4.1
Preparation
from;
factory
testing,
inventory,
or
a
distributor
rebuild
facility.
4.1.1
Drain
any
oil
that
may
be
in
the
power
end
and
then
fill
the
complete
power
end
cavity
with
the
specified
rust
preventative.
After
15
to
20
minutes,
drain
the
rust
preventative
back
into
its
storage
drum
for
future
use.
4.1.2
Remove
all
plungers,
pony
rods
(if
applicable),
baffle
discs,
packing
and
junk
rings.
4.1.3
Remove
and
clean
oil
level
gages,
pressure
gages
and
breather
caps.
Replace
with
pipe
plugs
in
threaded
openings.
Содержание KT-3350XP
Страница 19: ......
Страница 22: ......
Страница 24: ...KA 26G KA 28S GLAND GASKET KA 26 PONY ROD KA 28 SEALS KA 26 A PONY ROD PACKING GLAND ASSEMBLY...
Страница 26: ......