Electrical installation
Kendrion INTORQ | BA 14.0217 | 07/2021
62
7.7.3
Reduced switch-off times
AC switching must also be carried out for the mains supply side switching (fast engagement)! Otherwise,
there will be no overexcitation when it is switched back on.
Delayed engagement
Fast engagement
Mains
Bridge
Coil
Mains
Coil
7.7.4
Permissible current load at ambient temperature
Fig. 37:
Permissible current load
q
If screwed to metal surface (good heat dissipation)
w
For other installations (e.g. with adhesive)