1. Swing the bucket towards the track
entrapped in the mud.
2. Set the angles at 90~110
°
for bucket arm
and boom.
3. Push the bucket bottom (Not bucket teeth)
onto the ground.
4. Place a wood plate or similar object
beneath the lifted track.
5. Lift the bucket and drive out the machine
from the mud slowly.
If both tracks are stuck in the mud
1. Operate above-mentioned steps 1~4 for
both tracks.
2. Insert the bucket into the ground in the
front of machine.
3. Pull the bucket joystick during forward
traveling to slowly drive out the machine.
Allowed Operations of Machine
Digging
1. Place the bulldozing blade to the opposite
side of the digging zone.
2. Dig by bucket arm and bucket. It’s
preferable to dig by shallow depth and
large travel. The maximum digging force
is achieved when the angle between boom
and bucket arm is 80~120
°
. It’s preferable
to change the angle for effective digging.
3-21
Out of the mud
If the machine is entrapped in the mud, drive
out as per following procedure.
If a track gets stuck in the mud
Operations
Operating Procedures
Содержание XN10-8
Страница 9: ...Safety 1 1...
Страница 44: ...Safety Safety Signs 1 36...
Страница 49: ...Controls 2 1...
Страница 55: ...2 7 Records...
Страница 64: ...Operations 3 1...
Страница 87: ...Operations Parking of This Machine Locking Ensure to lock the following parts 3 24...
Страница 93: ...Transportation 4 1...
Страница 97: ...Transportation Lifting of Machine 4 5 unit mm...
Страница 99: ...Maintenance 5 1...
Страница 112: ...5 14 Records...
Страница 120: ...5 22 Records...
Страница 130: ...5 32 Records...
Страница 132: ...5 34 Records...
Страница 144: ...Troubleshooting 6 1...
Страница 155: ...Parameters 7 1...
Страница 159: ...Parameters Lifting power 7 5...
Страница 160: ...7 6 Records...
Страница 161: ...Optional products 8 1...
Страница 170: ...8 10 Records...
Страница 172: ...Optional products Canopy 8 12...
Страница 173: ...Parts number position Upper frame number 20060001 8 13...