Maintenance
As necessary
Checking of Rubber Tracks
If the status of rubber tracks is as shown in the
diagram below, please repair or replace. For
detailed repair or replacement, please consult
with your sales or service dealer.
Rubber Tracks
If any track is stretched and non-adjustable,
please replace the track.
(1) Handle
If the height (A) is ≤5mm, replace.
(2) Wire rope
5-41
If two or more segments of the wire rope are
exposed, please replace.
If more than half of the side face of wire rope is
cut, please replace.
(3) Metal core
Replace even if only one metal core falls off.
(4) Rubber
If the cracking length is ≥60mm, repair. If the
wire rope is visible, repair as soon as possible,
regardless of the cracking length.
≥60mm
Содержание XN10-8
Страница 9: ...Safety 1 1...
Страница 44: ...Safety Safety Signs 1 36...
Страница 49: ...Controls 2 1...
Страница 55: ...2 7 Records...
Страница 64: ...Operations 3 1...
Страница 87: ...Operations Parking of This Machine Locking Ensure to lock the following parts 3 24...
Страница 93: ...Transportation 4 1...
Страница 97: ...Transportation Lifting of Machine 4 5 unit mm...
Страница 99: ...Maintenance 5 1...
Страница 112: ...5 14 Records...
Страница 120: ...5 22 Records...
Страница 130: ...5 32 Records...
Страница 132: ...5 34 Records...
Страница 144: ...Troubleshooting 6 1...
Страница 155: ...Parameters 7 1...
Страница 159: ...Parameters Lifting power 7 5...
Страница 160: ...7 6 Records...
Страница 161: ...Optional products 8 1...
Страница 170: ...8 10 Records...
Страница 172: ...Optional products Canopy 8 12...
Страница 173: ...Parts number position Upper frame number 20060001 8 13...