Maintenance
Walk-Around Checking
Walk-Around Checking
Fulfill the following checking before the first start of engine each day.
Warning
●
Before operations, fulfill the walk-around checking and when necessary repair
immediately.
●
Before operations within the machine, please securely fix the engine hood or machine hood.
Keep the engine hood and machine hood closed under windy weather or while parking the
machine on a slope.
5-15
Before starting the engine, patrol around the machine and remove any combustible materials
around the engine. At the same time, check the machine for oil or water leakage, as well as loose
or damaged nuts, bolts or wires.
Содержание XN10-8
Страница 9: ...Safety 1 1...
Страница 44: ...Safety Safety Signs 1 36...
Страница 49: ...Controls 2 1...
Страница 55: ...2 7 Records...
Страница 64: ...Operations 3 1...
Страница 87: ...Operations Parking of This Machine Locking Ensure to lock the following parts 3 24...
Страница 93: ...Transportation 4 1...
Страница 97: ...Transportation Lifting of Machine 4 5 unit mm...
Страница 99: ...Maintenance 5 1...
Страница 112: ...5 14 Records...
Страница 120: ...5 22 Records...
Страница 130: ...5 32 Records...
Страница 132: ...5 34 Records...
Страница 144: ...Troubleshooting 6 1...
Страница 155: ...Parameters 7 1...
Страница 159: ...Parameters Lifting power 7 5...
Страница 160: ...7 6 Records...
Страница 161: ...Optional products 8 1...
Страница 170: ...8 10 Records...
Страница 172: ...Optional products Canopy 8 12...
Страница 173: ...Parts number position Upper frame number 20060001 8 13...