20/88 – K410054000001-00 / 03.2021 –
©
www.kemper-olpe.de
Operation
3
Surface Installation
3.1
Max. a half turn (10 teeth)
to the right: Corresponds to
reduction of the value by 2 K.
Shutting off
Close valve by turning oper-
ating cap (1) to the right.
1
2
Cleaning of Valve Seat
By the closing of the valve,
the valve seat ist automati-
cally cleaned.
Note!
After this, the valve
has again to be fully
opened (left turn to
end position).
Note!
Do not over-tighten
the end position
buffers!