1
1
8
0
M
IN
1
0
8
0
M
IN
2
0
0
M
IN
8
0
0
M
IN
TO
C
OM
B
U
S
TI
B
L
E
M
A
TE
R
IA
L
1
0
0
0
M
IN
FLASHING
25 MM MIN
CLEARANCE
25 MM MIN
CLEARANCE
BETWEEN 10” FLUE AND
FRAMING
25 MM MIN
CLEARANCE
BETWEEN BACK OF
UNIT AND FIBRE
CEMENT WALL /
BRICKS
METAL
CONSTRUCTION
MIN. 9mm FIBRE
CEMENT
SHEETING
FASCIA
FASCIA
VILLABOARD
HEAT DUCTING
BOX
18 MM BELLIS BOARD
OR EQUIVALENT
FOR WOODEN
FLOORS
725
670
DETAIL A
A
METAL FRAMING
OR REFRACTORY
10”
8”
6”
IF COWL IS LESS THAN 3000 MM
TO RIDGE LINE, COWL TO BE
600 MM ABOVE RIDGE
CELESTIAL 900
INFORMATION FOR TYPICAL
METAL FRAME
A
DOOR
SIDE VIEW
MANTLE
CEILING
METAL
FRAME
FIRE
BOX
(REFER HEARTH
MEASUREMENT
DRAWING IF UNIT IS
HIGHER THAN 200
MM FROM FLOOR.)
20/08/2020
ver. 29
10
Содержание CELESTIAL 900
Страница 15: ...20 08 2020 ver 29 15 ...
Страница 17: ...20 08 2020 ver 29 17 ...
Страница 20: ...20 08 2020 ver 29 NOTES 20 ...
Страница 21: ...20 08 2020 ver 29 21 ...
Страница 22: ...20 08 2020 ver 29 22 ...