In this section:
Site preparation checklist ......................................................... 2-1
Unpacking the S535 system..................................................... 2-2
Power and operating conditions ............................................. 2-19
Triaxial connector handling and avoiding contamination ........ 2-21
Lockout and tagout ................................................................. 2-22
Installation and connections ................................................... 2-23
Floor plan ............................................................................... 2-25
System cabinet size and weight ............................................. 2-27
Physically securing the system .............................................. 2-28
Optional advanced seismic securement ................................. 2-29
Site preparation checklist
The following site preparation checklist will help you prepare your site for the S535 system in your
facility. If you find that an item listed is not valid for your site, you can indicate it with "N/A."
S535 system preparation checklist
Site
Item
Is it necessary to have lifting equipment?
Is the flooring adequate and able to support the weight of the system while moving from receiving to the final
destination (see
(on page 2-25) for specifications)?
Are all of the corridors and hallways large enough to allow clearance for the system?
Are stairways adequate for moving the system through?
Are elevators needed to move the system? Can they support the size and weight of the system?
Are the doorways wide enough for the system?
If you are using a Keithley probe card adapter, you must supply a vacuum connection (50.80 cm Hg / 20 in.).
Floor plan Item
Did you complete the system layout (see
(on page 2-25) for specifications)?
Does your layout show all of the locations for all of the equipment?
Does your system layout show the locations of all doors and aisles?
Does your layout allow for the proper clearance of the system for the front, rear, and the keyboard/monitor
arm?
Is there enough space for personnel safety, comfort, and freedom of movement?
Section 2