Page 9
DOC1048R (21 December 2023 17:31)
www.keit.co.uk
Back to Table of Contents
Figure 1: Power and communication gland locations
The spectrometer body has an optional external M6 earth attachment point below the probe.
This can be used where local codes require it. The internal earth bonding through the power
supply cable is the primary earth and the external is optional. Please identify and adhere to
any applicable local standards.
WARNING
AVERTISSEMENT
Failure to properly earth the spectrometer may cause
serious injury or death.
Une mise à la terre incorrecte du spectromètre peut causer des
blessures graves, voire la mort.
Figure 2: Optional External Earthing point