background image

USER MANUAL - operation 

Slim Jim User manual 

 

page 12 

Sensor malfunction 

For each boiler sensor, the corresponding area in the display, as well as the 3-digit display, will show 
O.C. (open circuit, infinite resistance)  or C.C. (closed circuit, electric short) if there is a sensor 
malfunction. When a sensor malfunction is shown for a boiler, the heating of that boiler is dis-engaged. 
The machine will remain functional on the other boilers. When there is a steam boiler sensor 
malfunction the indicator LED(s) on the bastone units or touchpads will flash continuously. 

Even though the coffee boilers will remain operational when there is a steam boiler sensor 
malfunction, overall functionality of the machine will be low. Have the machine checked as soon as 
possible (probably you need to have the sensor replaced).  

oprational window 

 

 a closed circuit is 

detected at group 1 

temperature sensor. 

 

As the sensor in the heat exchanger manifold has no designated area on the control panel, a sensor 
error is indicated by a red center line in all groups. There is no distinction between open or closed 
circuit. With a malfunctioning sensor, the cool-valve will not open but the machine will remain 
functional. A non-functional cool valve may lead to overheating of the groups and rapid decay of the 
flow-meters in the machine. Have the machine repaired as soon as possible. 

operational window 

 

a heat exchanger 

manifold sensor 

malfunction is 

detected. 

 

Technical assistence 

In the no-heat or eco window (shown below) touch the left of the controll panel. The next window will 
show the telephone number to call for technical assitence, provided that the technician has entered 
the information. The back 

button will return to “NO HEAT” or “ECO MODE”, whatever the earlier 

setting was. 

no-heat window 

 

“NO HEAT”: the 

machine will cool 

down 

 

 

 

eco window 

 

“ECO”: the 

machine will settle 

at lower set 

temperature 

 

touch 

 

 

 

 

 

 

 

 

 

 

assistence window 

 

 

 

 

 

 

touch 

 

 

 

 

 

 

 

 

 

BACK will return to previously active window  

 

 

 

 

GROUP 1

O.C.

GROUP 2

45.6

GROUP 3

93.2

STEAM

124.6

MENU

GROUP 1

93.4

GROUP 2

45.6

GROUP 3

93.2

STEAM

124.6

MENU

THURSDAY  - 13:57

TECHNICAL ASSISTANCE

KEES VAN DER WESTEN

SLIM JIM

NO HEAT

THURSDAY  - 13:57

TECHNICAL ASSISTANCE

KEES VAN DER WESTEN

SLIM JIM

ECO

TELEPHONE NUMBER FOR TECHNICAL ASSISTANCE

+31 6 12345678

BACK

Содержание Mirage Slim Jim

Страница 1: ...Slim Jim User manual page 0 User manual Slim Jim in progress Document ID Sup Tum Eng Date of issue December 20 2018 Revision date...

Страница 2: ...PERATURE SETTING 15 Sub menu VOLUME SETTING 16 Sub menus TIMED ON OFF and TIME DAY 16 Timer function to switch the machine 16 Why switch to ECO 17 and not to OFF 17 Pump pressure 18 Check 18 Adjust 18...

Страница 3: ...Sulfate 30 0 50 ppm Chloride 0 0 30 ppm Silica 0 0 5 ppm Odor and colour clean fresh odor free clear Taste influencing organic compounds not present Chlorine Hypochlorite Chloramines Iron Lead Mangane...

Страница 4: ...Switch circuit 1 switches power to left group heating and lower spiral in steam boiler 6 Center group 3 digit display only on Triplette shot timer and or temperature 7 Capacitive interface and displa...

Страница 5: ...y The heating element of the steam boiler consists of a lower middle and upper section Notes The boilers will not heat up when the HEAT switches are in the OFF position With the main switch in OFF pos...

Страница 6: ...pad A touchpad has 5 momentary push buttons with internal indicator LED The upper button 5 larger circle is an on off group switch with programming function Buttons 1 4 are used to start a pre set vol...

Страница 7: ...3 digit display will display the temperature of the corresponding group during idle It changes to a shot timer when the group is activated The shot time will be replaced by the boiler temperature afte...

Страница 8: ...itch for dispense of water directly from steam boiler Push button switch for timed dispense of non sputtering mix water Figure 9 The hot water toggle switch and mix water push button switch Mixed wate...

Страница 9: ...s cloth for anything other than cleaning the steam tip Twist the valve knob to open close and adjust the steam flow From fully open to fully closed is about turn there is no need to close the valve fi...

Страница 10: ...wetted dominant water flow changes towards the pre infusion cylinder Pressure gradually increases until the cylinder is completely filled and all water has to flow through the coffee bed From that mo...

Страница 11: ...setting up to 80 power is saved while the boiler will still have a short heat up time In the operational window of the interface touch hold the button of the boiler that you want to change until the c...

Страница 12: ...NO HEAT or ECO MODE touch touch no heat window NO HEAT the machine will cool down eco window ECO the machine will settle at lower set temperature touch or operate a bastone touchpad touching the centr...

Страница 13: ...groups There is no distinction between open or closed circuit With a malfunctioning sensor the cool valve will not open but the machine will remain functional A non functional cool valve may lead to...

Страница 14: ...button CLEAN PROGRAM operational window touch menu window touch This will start the cleaning program The display will immediately return to the upper operational window The groups will pressurise dura...

Страница 15: ...volume is stored in memory Make sure to mimic an actual brew while programming volumes check that the machine is at operational temperature for some time and prepare the coffee bed as you normally wo...

Страница 16: ...nit remark display C F C setpoint group 1 80 0 99 9 C 176 212 F 93 0 C 199 4 F 0 1 C or F setpoint group 2 setpoint group 3 In a Duette there is no group 3 setpoint steam 110 130 C 230 266 F 125 C 257...

Страница 17: ...y program a shot volume with the touchpad bastone and then fine tune that volume on the control panel increase or decrease instead of brewing a new shot Note that the volume shown on the interface is...

Страница 18: ...of the machine is related to the square of the temperature difference between the machine and its environment Of course some extra energy is needed to heat up from ECO to operational temperature Switc...

Страница 19: ...s can be the result of deviations between pressure gauges and is no cause for alarm A large divergency may indicate a malfunction but can also be the result of different coffee bed preparation Redo th...

Страница 20: ...n of the boilers when the machine is turned to NO HEAT when it is at operational temperature If it is needed to cool down the machine quickly turn the heating circuits to OFF and open both steam taps...

Страница 21: ...washing up liquid and a sponge Activate the groups without filter holder locked in or let the hot water run for a moment and use a brush to push remains into the drain Remove filter basket Materials...

Страница 22: ...econd run you quickly empty a blind filter in between pressurising of the groups when the groups have depressurised you do the same with the next group etc Described next is the back flush procedure f...

Страница 23: ...a do not puncture the group screen Pry left and right the screen will fall out together with the group seal 2 Remove the group seal from the group screen 3 Soak the metal group screen in a solution o...

Страница 24: ...2 Remove the two bolts from plastic dispersion plate with short screwdriver see Figure 17 the dispersion plate will fall out Be careful with these screws they have specific length to match the thickn...

Страница 25: ...e group dispersion plate see previous item 2 Gently pull the dispersion base from the group bottom pull as perpendicular as possible Do not twist the dispersion base If the dispersion base does not co...

Страница 26: ...ate that falls outside the range given for that flat jet it is advised to have a technician check the machine diameter of flat jet mm minimum ml minute goal ml minute maximum ml minute 0 6 400 480 500...

Страница 27: ...d set the interface to show its temperature see page 13 to check individual temperatures of brews and or hot water Consistency in programmed volumes Programmed volumes mutate during a few days after i...

Страница 28: ...gure 20 Error report if the flow rate during a brew falls outside the flow meter range When you prefer to brew real slowly we advise to use scales under the cup in combination with manually de activat...

Страница 29: ...or nut when necessary Check anti vacuum valve for leakage Check safety valve on steam boiler for leakage Check opening pressure of expansion valve Check free flow rate per group clean flat jets when...

Страница 30: ...USER MANUAL maintenance Slim Jim User manual page 29 Maintenance Record machine number __________________ installation date _________________________________ Date Technician Task Comments...

Страница 31: ...USER MANUAL maintenance Slim Jim User manual page 30...

Страница 32: ...e cannot be held responsible for damage and or injuries resulting from actions performed on our machines by non qualified personnel Any qualified technician working on the machine is urged to thorough...

Отзывы: