background image

Cut the fabric larger than the worktop allowing about 10cm
(4”) overhang on all four sides. Apply tape or adhesive 
around the edges and   to the middle of the worktop.

Covering the worktop with fabric 

SECTION 6

Worktops can be covered with many types of worksurface, the Proteus covering (PN01/2/3) is a grey non woven fabric which will not
fray or unravel and can be moulded around worktop corners.

Proteus worktop fabric has a smooth upper surface and slightly rougher underside to key into adhesives. Use double sided carpet
tape, carpet/flooring adhesive or staples.

Fold the sides of the fabric down and pinch the flap made 
in each corner, trim with scissors.

Fold the fabric to the underside, again pinch and trim. A 
few staples in the underside will ensure the fabric is held in
place whilst the adhesive cures.

TOP

APPLY 
DOUBLE SIDED 
TAPE OR ADHESIVE

PINCH

PINCH

UNDERSIDE

ALSO APPLY
AROUND
EDGE ON
UNDERSIDE

Содержание PROTEUS

Страница 1: ...PROTEUS PROTEUS PROTEUS PROTEUS PROTEUS PROTEUS PROTEUS PROTEUS b y P PROTEUS Assembly instructions The key to a superb workplace KC AUG 08...

Страница 2: ...n of the beam on the leg when the assembly is complete This method is particularly useful when a beam is required to be flush with the end of a leg extrusion Use a measuring tape or make a spacer from...

Страница 3: ...n the correct position always fully tighten the grub screws with the short leg of the Allen key in the screw head using additional leverage of the long leg possibly another 1 1 2 turns or so For the r...

Страница 4: ...this stage Attach the joining brackets to the legs At this stage you need to decide the format of your bench table Here are a few ideas ITEM QTY Leg 4 Long Beam 4 Short Beam 4 ITEM QTY Allen Key 1 Sp...

Страница 5: ...elf made spacer to position them accurately to your requirements Put grub screws in each of the two large holes in every bracket only screw them in by 2 or 3 turns Make the end frames Fit two short be...

Страница 6: ...ension SECTION 2 When ordering an extension unit to an existing standard bench order one end frame with the same order prefix as the bench e g Order a PA01 end frame to extend a PA03 bench Then order...

Страница 7: ...t SECTION 3 ITEM PD02 PD07 Base Channel 10 7 Dividing Rod 33 24 Fixing Channel 2 2 Dividing Rod Support 3 3 Leg 4 4 Beam 3 4 3 4 ITEM QTY Allen Key 1 Spacer 1 TOOLS Put a grub screw backwards into eac...

Страница 8: ...e the end frames Lay the two legs for the LH end frame on the floor together and two of the set of four beams Slide a fixing channel in the top beam take note of the relative positions of the brackets...

Страница 9: ...eam is at the top Tighten the grub screws ensuring there are no gaps between the beam ends and the legs Repeat for the RH frame Remember to ensure the groove in the beam is on top Fit leg end caps Car...

Страница 10: ...nit The two channels on the outside fit tight to the inside of the beam leaving a small gap at the back of the channel Fitting the dividing rod supports dividing rods Fit the dividing rod supports ins...

Страница 11: ...Extension SECTION 4 ITEM PR02 PR07 Base Channel 10 7 Dividing Rod 33 24 Beam with holes 1 1 Dividing Rod Support 3 3 Leg 4 4 Beam 3 4 3 4 ITEM QTY Allen Key 1 Spacer 1 TOOLS Put a grub screw backwards...

Страница 12: ...and the legs then lock the grub screws using the short end of the allen key Change the frame on your existing unit Remove the worktop from your existing unit then Either Remove the dividing rods and...

Страница 13: ...are not show for clarity Complete the frame work Using the set of 3 beams assemble the unit as shown Ensure all grub screws are tightened fully and there are no gaps between the beam ends and legs Fit...

Страница 14: ...and push into the holes in the base channels Fitting the base channels Slide the base channels in place starting from the outside working towards the centre Ensure the set of holes in the edges are to...

Страница 15: ...screw backwards into each of the joining brackets do not place grub screws in the other holes at this stage Attach the joining brackets to the legs Using the spacer fit two brackets to the top of 4 le...

Страница 16: ...nd two of the set of four beams Slide a fixing channel in the top beam take note of the relative positions of the brackets in the drawing and the diamond hole in the fixing channel Fix the legs over t...

Страница 17: ...using the short end of the allen key Assemble the frame work Using the remainder of the beams assem ble the framework as shown Start from one end frame and attach 3 beams then the centre frame 3 beam...

Страница 18: ...and push into the holes in the base channels Fitting the base channels Slide the base channels in place starting from the outside working towards the centre Ensure the set of holes in the edges are to...

Страница 19: ...nd can be moulded around worktop corners Proteus worktop fabric has a smooth upper surface and slightly rougher underside to key into adhesives Use double sided carpet tape carpet flooring adhesive or...

Страница 20: ...f the beam and screwed into the underside of the worktop Position one clip near to each corner of the top and space any others accordingly Matboard storage units also have worktop fixing holes in the...

Страница 21: ...ote the flat faces of the bracket should face each other Attach the beams to the brackets Assemble the two beams on to the brackets and fasten with the grubscrews Fit the beam end caps Placing a matcu...

Отзывы: