manualshive.com logo in svg
background image

4

AA CONTROL PANEL

BB CONTROL PANEL

34×24 BB CONTROL PANEL

34×24 TS CONTROL PANEL

TS CPU CONTROL PANEL

AIR IN THE GAS SUPPLY LINE MAY REQUIRE A
LONGER THAN NORMAL PERIOD OF TIME TO
LIGHT YOUR FRYER DURING INITIAL INSTALLA-
TION OR AFTER OVERNIGHT SHUTDOWN

NOTE: 

Unless you have an AA model your fryer cannot

be operated during a power failure.

AA MODELS OPERATING INSTRUCTIONS

START-UP PROCEDURE

WARNING: DO NOT START FRYER WITHOUT
FIRST FILLING FRYER POT.

STEP 1. Set thermostat to the "OFF" position.
STEP 2. Turn "MAIN POWER" switch to the "OFF" 

position.

STEP 3. Turn gas valve knob to "PILOT" position.
STEP 4. Light constant pilot located on left side of 

pilot runner tube.

STEP 5. Push and hold the gas valve knob for 30 sec-

onds and release.

STEP 6. With the pilot still on, turn gas valve knob to

the "ON" position.

STEP 7. Set thermostat to desired temperature, turn

"MAIN POWER" switch to the "ON" position.
The burners will come on.

HIGH LIMIT TEST PROCEDURE (All Models):
DO BI-MONTHLY

STEP 1. Place a suitable thermometer in the oil on

the front left corner of the fryer 2" from the
top to check temperature.

STEP 2. Set thermostat to 375°F after burners go off.

Push and hold the "HIGH LIMIT TEST"
switch. The burners will come on.

STEP 3. When 425°F is reached the burners go off.

Now it is ok to release test switch.

STEP 4. If the high limit thermostat does not shut

down the burners between 425°-450°F as
read on the thermometer, the high limit must
be replaced immediately.

STEP 5. To re-start the fryer it must be cooled down to

cooking temperature and the red reset but-
ton on the high limit thermostat pushed.
Return to STEP 3 in the start-up procedure.

SHUTDOWN PROCEDURE

STEP 1. Set thermostat to the "OFF" position.
STEP 2. Turn "MAIN POWER" switch to the "OFF"

position.

STEP 3. Turn gas valve knob to the "OFF" position.
STEP 4. Turn gas supply valve to the "OFF" position.
STEP 5. Check to make sure all burners and pilot are

out.

BB MODELS OPERATING INSTRUCTIONS

START-UP PROCEDURE

WARNING: DO NOT START FRYER WITHOUT
FIRST FILLING FRY POT.

Содержание Miraclean 2000

Страница 1: ...ioning 1 Ventilation 1 National Code Requirement 1 Gas Connectors Pipe Size 2 Flexible Gas Connection Quick Disconnect Devices 2 Restraining Devices 2 Electrical Connection 2 Leveling 3 PLACING YOUR K...

Страница 2: ...l gas supplier THE EQUIPMENT IS TO BE INSTALLED TO COMPLY WITH THE BASIC PLUMBING CODE OF THE BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL INC BOCA AND THE FOOD SER VICE SANITATION MANUAL...

Страница 3: ...will be supplied by the car rier DO NOT RETURN DAMAGED MERCHANDISE TO KEATING FILE YOUR CLAIM AS ABOVE FIRST STEPS POSITIONING Keep appliance area free and clear of any com bustibles Position the Kea...

Страница 4: ...age to the gas valve The required gas pressure for proper operation of each fryer is 4 water col umn for natural gas and 10 water col umn for propane gas at the burner manifold If more than one gas un...

Страница 5: ...ers on ALWAYS disconnect fuel source and power supply before servicing NEVER move a fryer when full of oil NEVER introduce objects or liquids into fryer while operational which are not designed or mad...

Страница 6: ...will come on HIGH LIMIT TEST PROCEDURE All Models DO BI MONTHLY STEP 1 Place a suitable thermometer in the oil on the front left corner of the fryer 2 from the top to check temperature STEP 2 Set the...

Страница 7: ...ER switch to ON posi tion Its green light and the timers will come on STEP 3 Light constant pilot located on left side of pilot runner tube STEP 4 Hold the PUSH TO LIGHT switch for 30 seconds The pilo...

Страница 8: ...realize substantial savings in oil costs as well as maintenance charges We have listed some of the conditions which are catalysts in the breakdown of oil 1 Contact with Oxygen 2 Carbonization of Crum...

Страница 9: ...ly rinse fryer vessel with potable water to remove all Klenzer Prior to refilling with oil wipe the inside of the fryer vessel making sure all water and Klenzer have been removed NOTE Do not pump wate...

Страница 10: ...ssel making sure all water and Klenzer have been removed DO NOT DAMAGE OR REPOSITION THERMOSTAT PROBE AS THIS MAY AFFECT THE ACCURACY OF THE FRYER C CA AU UT TI IO ON N DO NOT MIX WATER AND HOT OIL 12...

Страница 11: ...THERMOSTATS These operational problems can easily be correct ed by thermostat bulb positioning Keating s patented thermostat application is accu rate within 2 F of the dial setting between 250 F 350 F...

Страница 12: ...r fryer 10x11 18 up The end of thermostat bulb should touch the burner tube for 14 fryers 6 Replace burners 7 Replace control panel back 8 Slide back fabric shield over capillary and care fully coil c...

Страница 13: ...lon will flash at a one second rate When the countdown has reached 00 00 the relay output contacts will open the display will flash and the audible alarm will sound To can cel the audible alarm press...

Страница 14: ...6 G 1 SWITCH ROCKER WHITE MOMENTARY PUSH TO LIGHT 032297 H 1 INDICATING LIGHT AMBER 021254 J 1 SWITCH ROCKER WHITE LIGHT REPLACEMENT KIT 058328 K 1 SWITCH ROCKER WHITE MOMENTARY HIGH LIMIT TEST 032297...

Страница 15: ...Drain Shown QTY DESCRIPTION P N A 3 3 FIN RADIANT 000041 B 1 POT 14 GAS WELDMENT Call 800 KEATING C 3 BURNER 028048 D 1 DRAIN VALVE 004553 1 REAR DRAIN VALVE NOT SHOWN 016341 E 1 RUNNER PILOT ASSEMBLY...

Страница 16: ...LP 023624 POT ASSEMBLY 20BB 20TS GAS Front Drain Shown QTY DESCRIPTION P N A 4 3 FIN RADIANT 000041 B 1 POT 20 GAS WELDMENT Call 800 KEATING C 4 BURNER 028048 D 1 DRAIN VALVE 004554 1 DRAIN VALVE 2 FR...

Страница 17: ...15 AA2000 ELECTRICAL ASSEMBLY BB2000 ELECTRICAL ASSEMBLY...

Страница 18: ...16 Electrical Assembly not shown to scale TS2000 ELECTRICAL ASSEMBLY Electrical Assembly not shown to scale BB ELECTRICAL ASSEMBLY WITH SE FILTER...

Страница 19: ...17 TS ELECTRICAL ASSEMBLY WITH SE FILTER BASKET LIFT ELECTRICAL ASSEMBLY ALL FRYERS...

Страница 20: ...Stir oil repeatedly with a paddle until water boils off Filter oil If necessary allow oil to cool Drain about one quart of it to remove remaining water Basket lift mechanism a Connections are loose or...

Страница 21: ......

Страница 22: ..._______________________________________________________________ INVOICE NUMBER ____________________ SERIAL NUMBER ________________________________________ FRYER FILTER SYSTEM GRIDDLE REMARKS _________...

Отзывы: