
V7.00
24905_EDEBD
A0272-5019-1_EN
51
The Commissioning submenu contains the following items:
1. Transformer settings (current, induced current, voltage)
a.
Series transformer
i.
Primary current
ii. Secondary current
iii. Phase allocation
b. Induced current transformer, external main current transformer
i.
Activate, single-phase or three-phase
ii. Primary current cabinet 1
iii. Secondary current cabinet 1
iv. Primary voltage for energy measuring module in cabinet 1
v. Secondary voltage for energy measuring module in cabinet 1
vi. Continue with cabinets 2 to 6
c.
Voltage transformer
i.
Primary voltage
ii. Secondary voltage
iii. Phase allocation
iv. Zero-point creator
2. Target cosine - settings
a.
Target cosφ for power consumption
b.
Target cosφ for power recovery
c.
Alarm cosφ for FTS message (facility too small)
3. Stages - Settings
a.
Auto configuration mode
b.
Stage parameter
i.
Stage selection
ii. Stage power
iii. Cabinet No.
iv. Discharge time
v. Detuning
vi. Operating cycles
vii. Overtemperature switch-off
viii. System type
ix. Special outputs (fans / alarm relays)
c.
Rated value (rated voltage Ph-Ph, power frequency)
System operation