– 2 –
* Hammer shank assy, wippen assy, keyboard, etc. are omitted in the drawing.
Detail B
Detail B
Detail A
Apply position of adhesive
Align to the R corner
of hammer shank
Detail A
【J】Action
【J-1】Installing the Shutter and the Stop Bracket
Assembling.Instruction
1. If the hammer rail and hammer rail screws are attached (not shown in the drawing), remove them.
2. Apply bond on the junction between the hammer shank and the hammer wood following the drawing
on the right.
3. Glue GP shutter ② on the hammer shank as shown in the drawing on the right.
4. Remove screws ⑥ from action assy ① , then fasten stop rail bracket assy ③ ④ ⑤ by tighten it
together with screws ⑥ again.
*.Install.one.by.one.as.not.to.change.the.coordination.of.action.brackets..
How.to.apply.bond.on.the.hammer.shank
*.Bond.to.use.:.Aron.Alpha.(Krazy.Glue).for.woodworking
*.Apply.bond.on.the.junction.between.the.hammer.shank.and.the.hammer.wood.show.in.Detail.A.
*.Leave.it.at.room.temperature.for.more.than.30.minutes.for.recuperating..
How.to.apply.bond.on.the.shutter
*.Bond.to.use.:Cemedine.Super.X.Clear
*.Align.to.the.curve.of.hammer.shank.show.in.Detail.B..
*.Push.the.shutter.thoroughly.as.not.to.float..
* Leave.it.at.room.temperature.for.more.than.30.minutes.for.recuperating.
* .While.waiting,.keep.leveling.the.hammer.shank.horizontality.as.not.to.be.
off.the.shutter.position..
No..
DESCRIPTION.
DESCRIPTION
REMARKS.
PN
1 Action.Assy.
Action.assy.
2 GP.Shutter.
Shutter
915076
3 Stop.Rail.Bracket.(1).Assy..
Stop.Rail.Bracket.(1).Assy
914134
4 Stop.Rail.Bracket.(2).Assy..
Stop.Rail.Bracket.(2).Assy
914967
5 Stop.Rail.Bracket.(3).Assy..
Stop.Rail.Bracket.(3).Assy
914991
6 +.PAN.WASHER.SEMS.
MACHINE.SCREW
+.Pan.washer.SEMS.machine.
screw
M5.x.15.SPW.
918661