Attention
Please prepare at least one three-hole socket and four two-hole sockets as there are quite a few cable
connections. Note that there must be sufficient distance between sockets as the adapter is quite big.
Preparation of Tools
Open the complimentary KAT WALK special tool box, which contains:
one bottle of KAT WALK PREMIUM maintenance oil
a set of inner hexagon spanners
one hook spanner 68-72
one open spanner 22-24
one KAT SHOES’wheel replacement tool
one screw box
16 Starting Installation
Installation Instructions
As the set of equipment needs to be supported by KAT STATION and HTC Lighthouse locating system, it is advised that
the place for installation shall be at least five meters wide with a floor height of at least three meters.
Please make sure to read in details the information provided in this manual prior to the installation of KAT WALK.
As the product itself is very heavy, please arrange at least three male adults to do the installation.
Keep the power off during installation and avoid potential safety hazards.
Please place a sponge pad of over 20cm thick (provided in the packing box) on the ground when installing the
support pillar to protect the shell from being damaged.
To avoid the influence of electric current, please do not open the girder shell when the product is working.
Even when there is no electricity, please do not open it by yourself as doing it without authorization will result in the
warranty invalidated.
Please do not put KAT WALK PREMIUM in a place where it is dusty, damp, shaky or with drastic temperature changes.
Содержание WALK Premium Package
Страница 1: ...KAT WALK Premium Package User manual...