RGBW PUSH-BUTTON CONTROLLER MANUAL
2
WIRING INSTRUCTIONS
1. Wiring the RGBW control panel to fountain control panel (refer to the RGBW control panel instructions
for panel mounting and installation requirements). Connect the RGBW panel power cord to the Kasco
Fountain control panel. The RGBW panel has flying leads to connect to the fountain panel terminal
blocks used to connect a standard light kit.
• C-85 and C-95 fountain control panels: Connect to terminal #’s. 6, 7, & Ground
• Green lead to Ground, Black lead to #6, & white lead to #7
• 3 phase CF fountain control panels connect to terminal #’s. 3, 4, & Ground lug
• Green to Gnd lug (ground lug), Black lead to #3, & white lead to #4
Refer to Fountain control panel instructions and schematics for detailed operation and connections.
Block Diagram of Light Kit and Control Panels
Connections for light kit
Green, Black, White wire
C-85 & C-95 Fountain Control Panel Field Terminal Connections