-
8
Hose clips; cable tape, on request.
Danger
Risk of poisoning in the event of improper
or inadequate ventilation! Install the waste
water treatment plants only in areas that
permit good ventilation. This is especially
important while topping up chemicals.
Note:
The plant must be installed in a hori-
zontal manner and aligned straight!
Î
Install the loosely delivered drain cock
at the connection (A).
Î
Fasten the pump in the dirt collector at
least 200 mm above the floor in such a
way that the floater switch can move
freely.
Î
Connect dirt water pump and inlet (G)
using DN 25 hose.
Danger
Risk of electrical voltage! All electrical in-
stallations may only be done by an electri-
cian according to the local regulations.
Î
Guide the electrical cable of the pump
through the opening (C) and connect it
to the terminal clips provided for it in the
control electronics.
Note:
Connection output of the dirt water
pump max. 1000 W.
Î
Guide Overflow (B) with DN 50 hose to
the dirt water collection basin.
Î
Guide emergency overflow (F) to the
dirt water collection tank or the drainage
system according to the local regula-
tions.
Î
Depending on the local conditions,
guide drain (E) to the HDS - ASA/HDR
(2.638-300) attachment set, processed
water storage tank or the drainage.
Î
Guide drain (H) to the drainage system
depending on the local conditions.
Socket requirements:
– Proper earthing
– Easy accessibility
– Secured with a fuse
Carry out proper installation according to
the assembling instructions of the respec-
tive attachment sets.
The dosing quantities for splitting and ster-
ilisation agents have been set in the factory
to an average value.
Note:
The dosing quantities must be ad-
justed by the Customer Service mechanic
at the installation site to match the level of
dirt in the waste water.
The operating type (recycling or inlet into
the drainage system) must be set by the
Customer Service mechanic.
The operator can carry out this task (see
"Start-up").
Accessories
Chemicals
Splitting agent, pow-
der
RM 846
20 kg
Special separators
RM 847
2x 1 l
Sterilisation agent W RM 851
30 kg
Required accessories
Description
Order No.
Recycling filter
6.286-359
Filter sack
6.286-358
Dirt collector attachment
set (230 V / 1~50 Hz)
– For filling the plant. The
attachment set consists
of an immersion pump
with floater switch with
stainless steel suction
basket and equipment
to fasten it to the wall or
edge of a basin.
2.638-333
Installation material DN 25
hose
6.388-283
Installation material DN 35
hose
6.389-750
Installation material DN 50
hose
6.389-751
Additional accessories
Description
Order No.
ASA/HDS attachment set
– For recycling operations
with high-pressure cleaner
(without fresh water rins-
ing)
2.638-346
HDS - ASA/HDR attachment
set
– For recycling operations
with high-pressure cleaner
and intergrated fresh wa-
ter supply for rinsing
(2.638-264 attachment
set).
2.638-300
Attachment set 'Fresh water
remote control'
– To trigger the rinsing proc-
ess in combination with
the attachment set 2.638-
300.
2.638-264
Installing the plant
Only for authorised techni-
cians!
Installation
Installing the dirt water pump
Connecting the overflows
Electrical connection
Connected to the high-pressure
cleaner (in recycling mode)
!
Settings
Dosing quantities
Operating mode
Topping up the chemicals
19
EN
Содержание HDR 777
Страница 2: ...2...
Страница 67: ...2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 67 RU...
Страница 68: ...3 14 1 3 3 4 18 7 16 9 5 18 8 17 13 13 10 9 12 12 ASA HDS HDS ASA HDR HDS ASA HDR 6 K rcher 15 a b d e 68 RU...
Страница 70: ...5 Karcher 70 RU...
Страница 71: ...6 190813 2 2 3 0 0 6 71 RU...
Страница 72: ...7 2 3 HDS ASA HDR HDS ASA HDR S2 S2 72 RU...
Страница 73: ...8 B F H 73 RU...
Страница 87: ...2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 87 UK...
Страница 90: ...5 K rcher 90 UK...
Страница 91: ...6 190813 2 2 3 0 0 6 91 UK...
Страница 92: ...7 2 3 HDS ASA HDR HDS ASA HDR S2 S2 92 UK...
Страница 93: ...8 B F H 93 UK...