OPERATION MANUAL
AF INTEGRA / AF-H INTEGRA ELT
PAGE: 601
JUN 20/2013
SERVICING
1. Maintenance Schedule
A. Periodic inspection
Note: (if required by the relevant Civil Aviation Authority).
Some Civil Aviation Authorities may require the ELT be tested periodically.
In this case, refer to Service Letter SL S1840501-25-05 "Guidelines for periodic
inspection" available on the Service & Support section of Kannad Aviation
Website.
B. Battery replacement
Testing of various elements and parameters of the ELT is mandatory when the
battery is replaced.
• For battery replacement interval,
Refer to § 2. Battery replacement
requirements, page 602
.
• The testing procedure associated with the battery replacement is
described in the relevant CMM
For CMM download and other servicing instructions, refer to Servcie & Support
section of Kannad Aviation Website.
Battery replacement:
carried out by an accredited PART 145 or FAR 145 (or equivalent)
maintenance station.
Periodic inspection:
depending if the ELT is opened or not, PART 145 or FAR 145 (or
equivalent) may be required. Refer to local regulations
Содержание AF INTEGRA
Страница 30: ...OPERATION MANUAL AF INTEGRA AF H INTEGRA ELT PAGE 112 JUN 20 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...OPERATION MANUAL AF INTEGRA AF H INTEGRA ELT PAGE 208 JUN 20 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 42: ...OPERATION MANUAL AF INTEGRA AF H INTEGRA ELT PAGE 304 JUN 20 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...OPERATION MANUAL AF INTEGRA AF H INTEGRA ELT PAGE 402 JUN 20 2013 PAGE INTENTIONALLY LEFT BLANK ...
Страница 51: ......