Jaden Kanga Group
Page
Jaden Kanga – OPERATORS MANUAL
22
LOADER BOOM MAINTENANCE
Always…
o
Secure the boom
by mechanical means
when carrying out
maintenance activities, particularly when working with the boom in the
raised position.
o
Keep a fire extinguisher on hand during maintenance operations.
o
Ensure the working area is kept clean and free of oil, grease and
debris.
o
Delineate the effective maintenance work area using witches hats.
Never…
o
Rely solely on the machine hydraulics to keep the boom elevated whilst
carrying out maintenance. A mechanical scotch should always be used to
physically hold the boom in the raised position.
4 IN 1 BUCKET SAFETY RULES
Always…
o
Establish and maintain a minimum 4 metre (12 foot) exclusion zone
around the local working area and ensure no person enters the zone,
other than the operator, whilst the loader engine is running.
o
Keep the general working area clear of bystanders and other workers.
Loader operations typically rely on rapid movement and direction changes.
It is important, therefore, that the whole operation area is kept clear of
other personnel and operators maintain vigilance about their immediate
surroundings.
o
Check with Local Authorities, and Land Owners about the presence of
underground services within the prospective working area prior to
commencement of work and dial 1100 to establish underground
services before work commences.
Never…
o
Place any article or body part between the jaws of an open bucket, or
under the bucket at any time.
TERMINATOR STUMP GRINDER SAFETY RULES
Always…
o
Establish and maintain a minimum 4 metre (12 foot) exclusion zone
around the local working area and ensure no person enters the zone,
other than the operator, whilst the loader engine and/or stump grinder is
running.
o
Keep the general working area clear of bystanders and other workers.
Loader operations typically rely on rapid movement and direction
changes. It is important, therefore, that the whole operation area is kept
clear of other personnel and operators maintain vigilance about their
immediate surroundings.
o
Check with Local Authorities, and Land Owners about the presence of
underground services within the prospective working area prior to
commencement of work.
o
Install effective perimeter hoarding/barricades.
Never…
o
Place any article or body part under, or in close proximity to, the grinder
at any time
.
Содержание 5 Series
Страница 14: ...Jaden Kanga Group Page Jaden Kanga OPERATORS MANUAL 14 SAFETY Summary ...
Страница 17: ...Jaden Kanga Group Jaden Kanga OPERATORS MANUAL Page 17 TASK PLANNING FOR THE KANGA LOADER ...
Страница 19: ...Jaden Kanga Group Jaden Kanga OPERATORS MANUAL Page 19 ...
Страница 50: ...Jaden Kanga Group Page Jaden Kanga OPERATORS MANUAL 50 HYDRAULIC CONNECTIONS Series 6 ...
Страница 51: ...Jaden Kanga Group Jaden Kanga OPERATORS MANUAL Page 51 HYDRAULIC CONNECTIONS Series 7 ...
Страница 77: ...Jaden Kanga Group Jaden Kanga OPERATORS MANUAL Page 77 ...
Страница 78: ...Jaden Kanga Group Page Jaden Kanga OPERATORS MANUAL 78 5 5 ...