Test operation
108
Installation
11. Test operation
11.1 The test operation must be carried out after the entire installation has been
completed.
11.2 Please confirm the following points before the test operation.
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
The power voltage fits the rated voltage of the air conditioner.
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
The gas-side and liquid-side stop values are both opened.
The air conditioner is pre-heated by turning on the power.
11.3 Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
Whether the switch on the remote controller works well.
Whether the buttons on the remote controller works well.
Whether the air flow louver moves normally.
Whether the room temperature is adjusted well.
Whether the indicator lights normally.
Whether the temporary buttons works well.
Whether the drainage is normal.
Whether there is vibration or abnormal noise during operation.
Outdoor unit
Whether there is vibration or abnormal noise during operation.
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
Whether any of the refrigerant is leaked.
Содержание KOU-12HFN1-QRC8
Страница 1: ...Contents i Energy Related Products SUPER DC INVERTER SERIES Service Manual 2013 LFIS B 1309...
Страница 2: ......
Страница 4: ......
Страница 17: ...Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m...
Страница 23: ...Field Wiring Indoor Units 19 9 Field Wiring...
Страница 31: ...Wiring Diagrams Indoor Units 27 KTB 24HWDN1 QRC4...
Страница 42: ...Service Space 38 Indoor Units 3 Service Space...
Страница 44: ...Wiring Diagrams 40 Indoor Units KUE 36HRFN1 QRC8 A...
Страница 47: ...Indoor Units 43 9 Field Wiring...
Страница 50: ...Dimensions 46 Indoor Units 2 Dimensions...
Страница 51: ...Service Space Indoor Units 47 3 Service Space...
Страница 52: ...Wiring Diagrams 48 Indoor Units 4 Wiring Diagrams KCA2U 12HRFN1 QRC8 KCA2 18HRFN1 QRC8...
Страница 56: ...52 Indoor Units 10 Field Wiring KCA2U 12HRFN1 QRC8 KCA2 18HRFN1 QRC8...
Страница 58: ......
Страница 61: ...Dimensions Console Type 57 2 Dimensions KFAU 12HRFN1 QRC8 KFA 16HRFN1 QRC8...
Страница 62: ...Service Space 58 Console Type 3 Service Space...
Страница 63: ...Wiring Diagrams Console Type 59 4 Wiring Diagrams KFAU 12HRFN1 QRC8 KFA 16HRFN1 QRC8...
Страница 68: ...Field Wiring 64 Console Type 10 Field Wiring KFAU 12HRFN1 QRC8 KFA 16HRFN1 QRC8...
Страница 74: ...Wiring Diagrams 70 Outdoor Units 4 Wiring Diagrams KOU 12HFN1 QRC8...
Страница 76: ...Wiring Diagrams 72 Outdoor Units KOU 36HFN1 RRC4 KOU 36HFN1 RRC8 520 KOU 36HFN1 QRC8 5A0...
Страница 77: ...Wiring Diagrams Outdoor Units 73 KOU 36HFN1 RRC8 5A0...
Страница 102: ...Refrigerant pipe installation 98 Installation...
Страница 110: ...Engineering of insulation 106 Installation cause leakage to damage the house decoration...