W W W . K A A R T A . C O M
1 9
Figure 22: Final stowage of Upper Vehicle Mount Assembly.
6.
Once all Upper Support Arms are stowed in position, secure the arms in the stowed
position by tightening all four (4) M8 x 16 long socket head fasteners to secure arms
to the Top Cross Rail.
7.
Using a 3mm hex allen key, tighten the remaining M5 flat head fasteners in the pivot
joints.
8.
Package Upper Vehicle Mount Assembly and Vehicle Mount Base Assembly as
shown in Figure 2 on page 5 for shipping. Stowed assembly dimensions (inches) are
shown in Figure 2.