K-Line Ag
©
__________________________________________________________________
Page | 27
RISK MANAGEMENT
Risk management is the process of finding out what may cause an injury, deciding what
may happen as a result, and doing something about it.
The steps of risk management are:
Identify the hazards to workplace health and safety arising from work activities
Assess the risks
Determine and implement control measures to reduce risk
Monitor and review the effectiveness of the control measures
IDENTIFYING HAZARDS
Prior to commencing work, all hazards related to the work tasks should be identified.
The selection of the appropriate work procedure(s) will depend on the type of work
procedure(s) and hazards involved. Regular safety inspections will also identify hazards
and ensure that control measures are in place.
RISK ASSESSMENT
Risk assessment allows appropriate control measures to be developed. Once hazards
have been identified, they should be assessed in terms of their potential to do harm. To
assess risk, consideration should be given to probability and consequences. SEE RISK
ASSESSMENT MODEL.
RISK CONTROL
Risk control is the process of eliminating or reducing risk factors. Control measures
should be chosen and implemented to eliminate or reduce risk as far as practicable.
When deciding on the most appropriate measures to use, practicality and acceptance of
the control measures should be considered. Safe Working Procedures will be developed
for all high
– medium risk hazards.
MONITOR AND REVIEW CONTROL MEASURES
The risk identification, assessment and control process requires regular monitoring to
ensure the implemented control measures perform as originally intended and continue
to prevent or adequately control the risk of injury or incident. Control measures should
also be checked carefully to ensure that new hazards are not created, directly or
indirectly, by the original control measures.
Ris
k
M
a
n
a
g
e
me
n
t
Содержание CropCommander
Страница 1: ...OPERATOR SAFETY MANUAL CropCommander MODEL CC75 Seeder Bar Serial No ...
Страница 2: ...K Line Ag __________________________________________________ ...
Страница 4: ...K Line Ag __________________________________________________ ...
Страница 27: ...K Line Ag ___________________________________________________________________ Page 23 Performing Maintenance ...