6. Pack poles and pegs into the bag first, followed by the
awning with the flysheet on top.
6. The awning poles and pegs should go in
the bag first followed by the awning with the
flysheet on top.
Make sure sharp parts such as pegs don’t cut
or rub the material during storage/transport.
5. Remove the six pegs from the ground sheet
and fold all six legs to the centre.
Neatly wrap the canvas around the legs and
secure with the retaining strap.
5. Fold legs to centre, wrap canvas around legs and
secure with retaining strap.
0845 1204582
www.justkampers.com
JK part numbers:
J20264
OEM part number:
Not applicable
Just Kampers, Unit 1 Stapeley Manor, Long Lane, Odiham, Hants. RG29 1JE
NB. Please note that whilst every attempt is made to ensure that these instructions are as
accurate and clear as possible, we cannot be held responsible for misinterpretation of these
instructions or for any subsequent accident or damage caused through mis-fitted parts.
Tech Sheet
Spot Colour Pantone 653
Spot Colour P653/P151
Spot Colour White out
4 Colour Blue
4 Colour White out
4 Colour Blue/Orange
Black
White
Spot Colours
Process Colours
Page 7 of 7
4. On the outside press the release buttons on
all six lower knuckles and fold the legs in.
On the four outer roof bars press in the release
buttons and push the poles back into the
closed position.
Remove roof clips.
4. Release lower knuckles, fold legs.
Release roof bar buttons and push in.