Installing the CTP2000 Platform in a Rack
To install the CTP platform in a rack, you need:
•
Phillips screwdriver
•
Four 10-32 x 3/8 Phillips screws for each device to be installed
Follow these guidelines:
1. Following your installation plan, use a tape measure and marking pen to measure and mark space on
each equipment rack for each platform component. For horizontal spacing, follow Network Equipment
Building System (NEBS) requirements.
2. With one person standing on the left side of the device and another standing on the right side, lift the
device into the rack.
3. Position the device in its designated location in the equipment rack. Make sure the holes of the mounting
brackets align evenly with the holes of the equipment rack on both sides.
4. Starting at the bottom of the device, secure the device in the equipment rack by using the 10-32 x 3/8
Phillips screws. Have a third person do this for the larger and heavier CTP chassis.
5. Connect the necessary cables. (See
“Cabling the CTP2000 Platform Overview” on page 108
for instructions
about installing the cables.)
RELATED DOCUMENTATION
Before You Install the CTP2000 Platform | 90
Installing the CTP2000 Platform in Freestanding Mode | 91
Cabling the CTP2000 Platform Overview | 108
92
Содержание CTP2000 Series
Страница 1: ...CTP2000 Series Circuit to Packet Platforms Hardware Guide Published 2020 08 31 ...
Страница 8: ...1 PART Overview CTP2000 Series Platform Overview 2 CTP2000 Series Interface Modules 11 ...
Страница 112: ...Installing SFPs in a CTP2000 Module 102 105 ...
Страница 127: ...5 PART Configuration Accessing the CTP2000 Platform 121 ...
Страница 144: ...7 PART Troubleshooting Troubleshooting Power Failures 138 Contacting Customer Support 140 ...
Страница 149: ...Locating CTP Component Serial Numbers 141 Returning CTP Products for Repair or Replacement 136 142 ...