81
03
.1
1
E
N
6.4
Check the gear oil level
Check the transmission oil level
Requirements
– Park the truck securely, (see "Parking the truck securely" on page 44).
Tools and Material Required
– Oil sump
Procedure
• Place the oil sump underneath the transmission
• Remove the front cover (17), (see "Removing the front panel" on page 79).
• Undo 2 x screws (72) with an Allen key.
• Carefully lift off the wheel cover (73).
• Check the transmission oil level. It should reach the filler neck.
• Add the correct grade of transmission oil as required.
The transmission oil level is now checked.
6.5
Replacing the gauze filter, flushing the gauze filter
Replacing the gauze filter, flushing the
gauze filter
Requirements
– Prepare the truck for maintenance and
repairs. (see "Preparing the truck for
maintenance and repairs" on page 78).
Procedure
• Remove the front cover (17). (see "Removing
the front panel" on page 79).
• Undo the union (74).
• Remove the connection (75) and take out the
gauze filter.
• insert a clean / new filter.
New/ cleaned gauze filter is inserted.
Z
Assembly is the reverse order.
74 75
81
03
.1
1
E
N
6.4
Check the gear oil level
Check the transmission oil level
Requirements
– Park the truck securely, (see "Parking the truck securely" on page 44).
Tools and Material Required
– Oil sump
Procedure
• Place the oil sump underneath the transmission
• Remove the front cover (17), (see "Removing the front panel" on page 79).
• Undo 2 x screws (72) with an Allen key.
• Carefully lift off the wheel cover (73).
• Check the transmission oil level. It should reach the filler neck.
• Add the correct grade of transmission oil as required.
The transmission oil level is now checked.
6.5
Replacing the gauze filter, flushing the gauze filter
Replacing the gauze filter, flushing the
gauze filter
Requirements
– Prepare the truck for maintenance and
repairs. (see "Preparing the truck for
maintenance and repairs" on page 78).
Procedure
• Remove the front cover (17). (see "Removing
the front panel" on page 79).
• Undo the union (74).
• Remove the connection (75) and take out the
gauze filter.
• insert a clean / new filter.
New/ cleaned gauze filter is inserted.
Z
Assembly is the reverse order.
74 75
Содержание EJC B14
Страница 1: ...09 05 03 11 50470432 EJC B14 B16 Operating instructions G EJC B16 EJC B14...
Страница 3: ...03 11 EN 4...
Страница 9: ...0506 GB 2...
Страница 17: ...03 11 EN 16 3 2 Dimensions h4 h3 h1 l2 l1 l c y Q h s h8 b5 Ast W a B m2 20 5 h2 b4...
Страница 25: ...03 11 EN 24...
Страница 29: ...03 11 EN 28...
Страница 37: ...03 11 EN 36...
Страница 39: ...03 11 EN 38 2 Displays and Controls 7 9 10 12 8 14 50 47 48 49 3 5 3 2...
Страница 86: ...85 03 11 EN Spay all exposed electrical contacts with a suitable contact spray...
Страница 107: ...0506 GB 18...