When the p.c.b. is installed, insert the cable to SC-910 following "Instruction Manual for DLU-5494N-7/SC-910/
M-91/IP-100C/KT-01", and connect the cable to EPF p.c.b. following the steps below.

9. After inserting the connector, put all cords together

with cable clip band 

!4

 located on the side of the

box.

At this time, bundle the connectors which are

arranged above the wire saddle to wire saddle 

!5

and those which are arranged below the wire

saddle to wire saddle 

!6

.

*

For installing from M-91 motor to SC-910 control box or installing SC-910 control box on the table,
refer to "Instruction Manual for DLU-5494N-7/SC-910/M-91/IP-100C/KT-01".

1. Fix the cord clamp and the cable clip band following the attaching procedure.

(Refer to "Instruction Manual for DLU-5494N-7/SC-910/M-91/IP-100/KT-01".)

2. When removing the connector, remove it from the wire saddle and remove it while pressing the

hook of the cable clip band.

4. Securely fix EPF p.c.b. A (asm.) 

1

 to the control

box main unit using three screws 

4

 supplied with

the unit as accessories.

4

1

3

3. Insert EPF p.c.b. A (asm.) 

1

 to connector CN47

3

 of the main unit as illustrated.

Do not forcibly press the circuit board.

!5

!4

!6

5

9

6

7

!3

!1

8

!0

!2

Cau   tion

Cau   tion

5. Connect 6P connector 

5

 coming from the machine

head to connector 

9

 (CN139).

6. Connect 4P connector 

6

 coming from the machine

head to connector 

!0

 (CN134).

7. Connect 14P connector 

7

  coming from the

operation display panel to connector 

!1

 (CN132).

8. Insert EPF relay connector 

8

 to connector 

!2

(CN141) and connector 

!3

 (CN42).

Содержание DLU-5494N-7/IP-100C

Страница 1: ...INSTALLATION MANUAL ENGLISH ...

Страница 2: ... THE HARDWEAR 1 1 Attaching the circuit board 1 3 SETUP OF THE SOFTWARE 3 1 Checking procedure of the software version 3 2 Rewriting procedure of the software by means of IP 100 4 1 Common procedure 4 2 Rewriting procedure of the software of IP 100 5 3 Rewriting procedure of the software of main shaft 6 ...

Страница 3: ...he procedure below 1 CHECK AT THE BEGINNING 1 Control box to be used 2 List of parts to be used 2 SETUP OF THE HARDWEAR 1 2 1 DLU 5494N 7 machine head 2 IP 100C panel 3 SC 910 control box 4 M 91 motor 5 Extension p c b EPF p c b for DLU 5494N 7 1 Open the front cover and upper cover according to the instructions given in the Instruction Manual for the control box main unit 1 Attaching the circuit ...

Страница 4: ...lamp and the cable clip band following the attaching procedure Refer to Instruction Manual for DLU 5494N 7 SC 910 M 91 IP 100 KT 01 2 When removing the connector remove it from the wire saddle and remove it while pressing the hook of the cable clip band 4 Securely fix EPF p c b A asm 1 to the control box main unit using three screws 4 supplied with the unit as accessories 4 1 3 3 Insert EPF p c b ...

Страница 5: ... the screen below Then press switch 2 to open the RVL check screen Information maintenance level screen RVL check screen When the version of is not displayed there is a possibility that either of the software may be unadaptable Check the versions of the aforementioned software 3 SETUP OF THE SOFTWARE 1 Checking procedure of the software version 1 Information switch 2 Cau tion Be sure to start from...

Страница 6: ...nformation maintenance level screen The screen changes to the screen below Then press switch 2 for three seconds to open the communication setting screen When the screen has changed to the communication setting screen press switch 3 to display the data classification selection pop up Communication setting screen 2 Rewriting procedure of the software by means of IP 100 When the smart media is not i...

Страница 7: ... to 3 2 3 Rewriting procedure of the software of main shaft 2 Rewriting procedure of the software of IP 100 Data classification selection pop up Press switch 1 in the data classification selection pop up to select the rewriting of the software of IP 100 Then press switch 2 to execute reading During reading data screen Data classification selection pop up 1 2 State that the program is read from the...

Страница 8: ...on screen press switch 1 and repeat the selection operation until the programs of IP 100 SC and 01 02 0100 are selected When the programs are displayed from the beginning it is not necessary to perform the selection operation When the preparation is ready press switch 2 to start writing During writing screen IP 100 The aforementioned screen is the during writing screen During displaying the during...

Страница 9: ...een Main shaft When the screen has changed to the aforementioned program selection screen press switch 1 and repeat the selection operation until the programs of SC 910A and 01 04 0100 are selected When the programs are displayed from the beginning it is not necessary to perform the selection operation When the preparation is ready press switch 2 to start writing Press switch 1 in the data classif...

Отзывы: