– 1 –
– 1 –
– 1 –
There are cases where the control box to be used may
not be utilized. Check that REV. No.
1
as shown in
Fig. A is after "02". If the number is before it, the control
box cannot be used.
On the occasion of using DLU-5494N-7/IP-100C, check that the products (parts) below are on hand.
When the parts to be used are ready, install the extension p.c.b. on SC-910 following the procedure
below.
1. CHECK AT THE BEGINNING
(1) Control box to be used
(2) List of parts to be used
2. SETUP OF THE HARDWEAR
1
2
1. DLU-5494N-7 machine head
2. IP-100C panel
3. SC-910 control box
4. M-91 motor
5. Extension p.c.b (EPF p.c.b.) for DLU-5494N-7
1. Open the front cover and upper cover according
to the instructions given in the Instruction Manual
for the control box main unit.
(1) Attaching the circuit board
2. Insert stud
2
supplied with the unit as accessories
to EPF p.c.b. A (asm.)
1
.
Be careful of the inserting direction.
1
Fig. A
Cau tion
Inserting position
Rear side
Содержание DLU-5494N-7/IP-100C
Страница 1: ...INSTALLATION MANUAL ENGLISH ...