background image

JPK 3

13

Data Sheet

9.

Data Sheet

9.1

Type

Sample water cooler

Abbreviated name

: JPK 3

9.2

Models

9.3

Technical Data

The sample water cooler is suited for the
use in heating circuits up to a heat water
temperature of  maximum 100°C (212 °F).

Water pressure maximum of 3 bar.

For the easy operating and maintenance
sufficient space has to be provided.

DIN 1988 and DIN 19635 have to be ob-
served.

Technical specifications, local installa-
tion descriptions and general guidelines
(z.B WVU, DIN, DVGW, ÖVGW, SVGW)
have to be taken into consideration.

The recipient is made of plastic,
equipped with connections for the cool-
ing water inlet BSP R ¾” and –outlet  as
well as for the sample water inlet BSP R
¼” sample water outlet  ¼”, heat ex-
changer made of stainless steel 1.4301
as well as shut-off- and  regulation or-
gans. 

9.4

Installation Dimensions JPK 3

A = Installation Length

B = Device Width

C = Height above the centre of the pipe

D = Height below the centre of the pipe

E = Depth to the centre of the pipe

Model

Order-Number

JPK 3

8460050

Nominal Pressure

Model

Operating 
Pressure

Nominal 
Pressure

JPK 3

max. 3 bar

PN 10

1

1. At a maximum  water temperature of
30°C (86°F).

Weight

Model

Weight

JPK 3

2.0 kg

Fig. 5:

Installation Dimensions JPK 3

Model

A

B

C

D

JPK 3

180

76

190

230

40

Alle Maße in [mm] (see fig.5)

Содержание JPK 3

Страница 1: ...ing and putting the unit into service These must always be issued to the owner user Prolongated guarantee period if a maintenance contract has been concluded Installation and Operating Instructions JU...

Страница 2: ...rints even of extracts is only permitted with special approval Dear Customer We would like to thank you for your con fidence in us which you have shown by purchasing this device The product you have p...

Страница 3: ...ooler These operation instructions shall make it easier to become acquainted with the sam ple water cooler and to profit from its intend ed field of application The operation instructions contain impo...

Страница 4: ...attention to imperatively and have to be kept in a completely legible state 1 2 Security Advices and Dan gers in Case of Non compli ance In detail the non compliance of the general danger symbols can...

Страница 5: ...e obser vance of the operation instructions Before using the sample water cooler bey ond the utilization limits stated in the opera tion manual the manufacturer supplier ha ve by all means to be conta...

Страница 6: ...water cooler the free space should not be less than 250mm These distances are necessary in order to be in a position to effectuate and easy operation and maintenance in a proper way For the shut off...

Страница 7: ...lt in rotary flange can be caused Considerable water damages can be the consequential effect Persons that stay near to the sample water cooler are exposed in that case to a sani tary risk due to hot w...

Страница 8: ...l of hot water samples is not only dangerous but leads inevitably to imprecise and false analysis results Therefore the measurement of the content of oxygen binder is not possible due to the fact that...

Страница 9: ...o 30 l h 0 05 up to 0 13 gpm US 0 04 up to 0 12 gpm UK Flush the Erlenmeyer flask re peatedly in order to effectuate the sam pling removal ATTENTION see chapter Security Advices and Dan gers in Case o...

Страница 10: ...tions stated in the chapters In stallation and Maintenance have to be strictly observed 5 5 Service Interruption ATTENTION see chapter Security Advices and Dan gers in Case of Non compliance In the ca...

Страница 11: ...ich can lead to brittleness right up to brittle fractures These kinds of cleaners must therefore not be used 7 2 Indicating plate ATTENTION see chapter Security Advices and Dan gers in Case of Non com...

Страница 12: ...ended to aim at the main tenance works and the supply of the con sumer and wear parts being effected by the skilled handicraft or the manufacturer client service In the sense of our General Sales and...

Страница 13: ...recipient is made of plastic equipped with connections for the cool ing water inlet BSP R and outlet as well as for the sample water inlet BSP R sample water outlet heat ex changer made of stainless...

Страница 14: ...ete state Tranport damages have to be reported within twenty four hours due to the fact that unless for actuarial reasons any adjustment of claims can be effected Measuring instrument Order number Sul...

Страница 15: ...et tester 8690001 Buffer solution 8721098 Measuring instrument Order number Item Designation Piece Order No VE1 Piece 1 Retention Sieve 1 2460023 4 2 Clamp ring screw connection 1 1450255 7 3 Erlenmey...

Страница 16: ...eu JUDO France S r L 76 Rue de la Plaine des Bouchers Technosud F 67100 Strasbourg Tel 33 0 3 88 65 93 94 Fax 33 0 3 88 65 98 49 e mail info judo fr www judo fr Installed by JUDO HEIFI SOFT Mobile so...

Отзывы: